YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Understanding the Determinants of Program Organization for Construction Megaproject Success: Case Study of the Shanghai Expo Construction

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 005
    Author:
    Yi Hu
    ,
    Albert P. C. Chan
    ,
    Yun Le
    DOI: 10.1061/(ASCE)ME.1943-5479.0000310
    Publisher: American Society of Civil Engineers
    Abstract: Program management is increasingly regarded as a key approach to improving the performance of a construction megaproject through the coordinated management of its constituent projects. However, previous studies have seldom provided a pragmatic program management framework that can fully address the requirements of clients in managing construction megaprojects. Therefore, based on a case study of the Shanghai Expo construction, this study aims to identify the principal program organization factors (POFs) that are determinants of the program organization established by a client to manage a megaproject. Mixed research methods, such as case study, literature review, interviews, Delphi survey, and archival methods, are employed in this study. Consequently, 12 principal POFs, grouped under three main categories (environmental capability, core capacity, and motivational capability of the client’s program organization to manage its construction megaproject), are identified: (1) contextual understanding, (2) program strategy, (3) program leadership, (4) scope management, (5) program governance, (6) matrix organizational structure, (7) program management office, (8) use of project breakdown structure and work breakdown structure tools, (9) partnering with key stakeholders, (10) technology management, (11) communication management, and (12) team building. These research findings will help scholars and professionals, particularly those in China, to appreciate the key issues in managing megaprojects through program organization.
    • Download: (172.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Understanding the Determinants of Program Organization for Construction Megaproject Success: Case Study of the Shanghai Expo Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/71359
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorYi Hu
    contributor authorAlbert P. C. Chan
    contributor authorYun Le
    date accessioned2017-05-08T22:06:06Z
    date available2017-05-08T22:06:06Z
    date copyrightSeptember 2015
    date issued2015
    identifier other26309882.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/71359
    description abstractProgram management is increasingly regarded as a key approach to improving the performance of a construction megaproject through the coordinated management of its constituent projects. However, previous studies have seldom provided a pragmatic program management framework that can fully address the requirements of clients in managing construction megaprojects. Therefore, based on a case study of the Shanghai Expo construction, this study aims to identify the principal program organization factors (POFs) that are determinants of the program organization established by a client to manage a megaproject. Mixed research methods, such as case study, literature review, interviews, Delphi survey, and archival methods, are employed in this study. Consequently, 12 principal POFs, grouped under three main categories (environmental capability, core capacity, and motivational capability of the client’s program organization to manage its construction megaproject), are identified: (1) contextual understanding, (2) program strategy, (3) program leadership, (4) scope management, (5) program governance, (6) matrix organizational structure, (7) program management office, (8) use of project breakdown structure and work breakdown structure tools, (9) partnering with key stakeholders, (10) technology management, (11) communication management, and (12) team building. These research findings will help scholars and professionals, particularly those in China, to appreciate the key issues in managing megaprojects through program organization.
    publisherAmerican Society of Civil Engineers
    titleUnderstanding the Determinants of Program Organization for Construction Megaproject Success: Case Study of the Shanghai Expo Construction
    typeJournal Paper
    journal volume31
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000310
    treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian