YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Improving Predictability of Construction Project Outcomes through Intentional Management of Indirect Construction Costs

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 006
    Author:
    Timothy C. Becker
    ,
    Edward J. Jaselskis
    ,
    Mohamed El-Gafy
    DOI: 10.1061/(ASCE)CO.1943-7862.0000845
    Publisher: American Society of Civil Engineers
    Abstract: Indirect construction costs (IDCC) comprise from as little as 10 to 40% or more of the total cost of construction projects, in part depending on the type and nature of the project. Yet, any location in this range represents a significant component of total project costs, which justifies the need to better understand and develop effective practices to estimate, control, and manage IDCC. When IDCC practices are not afforded intentional management and appropriate resources, key project performance outcomes are affected. As its unique contribution to the body of knowledge, this paper operationally defines IDCC, outlines certain innovative IDCC practices, and identifies statistically significant relationships between key IDCC practices and project outcome metrics. Empirical recommendations are premised upon data collected through testimonials, structured interviews, and brainstorming sessions of an extensive set of construction industry professionals. Statistical findings are based upon data collected through 56 one-on-one data-collection interviews with subject matter experts and 47 project-level surveys. Qualitative data were filtered, organized, and aggregated and are technically presented as instructional guidelines. Quantitative data were statistically analyzed and results from this analysis show several significant relationships between IDCC practices and key project outcomes, including a positive correlation between the frequency of IDCC review meetings that included project managers and field supervisors and quality and cost performance.
    • Download: (2.618Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Improving Predictability of Construction Project Outcomes through Intentional Management of Indirect Construction Costs

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/71217
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTimothy C. Becker
    contributor authorEdward J. Jaselskis
    contributor authorMohamed El-Gafy
    date accessioned2017-05-08T22:05:46Z
    date available2017-05-08T22:05:46Z
    date copyrightJune 2014
    date issued2014
    identifier other23474917.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/71217
    description abstractIndirect construction costs (IDCC) comprise from as little as 10 to 40% or more of the total cost of construction projects, in part depending on the type and nature of the project. Yet, any location in this range represents a significant component of total project costs, which justifies the need to better understand and develop effective practices to estimate, control, and manage IDCC. When IDCC practices are not afforded intentional management and appropriate resources, key project performance outcomes are affected. As its unique contribution to the body of knowledge, this paper operationally defines IDCC, outlines certain innovative IDCC practices, and identifies statistically significant relationships between key IDCC practices and project outcome metrics. Empirical recommendations are premised upon data collected through testimonials, structured interviews, and brainstorming sessions of an extensive set of construction industry professionals. Statistical findings are based upon data collected through 56 one-on-one data-collection interviews with subject matter experts and 47 project-level surveys. Qualitative data were filtered, organized, and aggregated and are technically presented as instructional guidelines. Quantitative data were statistically analyzed and results from this analysis show several significant relationships between IDCC practices and key project outcomes, including a positive correlation between the frequency of IDCC review meetings that included project managers and field supervisors and quality and cost performance.
    publisherAmerican Society of Civil Engineers
    titleImproving Predictability of Construction Project Outcomes through Intentional Management of Indirect Construction Costs
    typeJournal Paper
    journal volume140
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000845
    treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian