YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Post-rehabilitation Cable Force Adjustment of the Tension Rocker Bearing in a PC Cable-stayed Bridge

    Source: Journal of Highway and Transportation Research and Development (English Edition):;2013:;Volume ( 007 ):;issue: 002
    Author:
    Chen Yun-hai
    ,
    Li Hong-jiang
    ,
    Lü Jian-ming
    DOI: 10.1061/JHTRCQ.0000315
    Publisher: American Society of Civil Engineers
    Abstract: Taking the maintenance of a PC cable-stayed bridge as the background, a simulation and calculation analysis of construction control was conducted, and the scheme of stay cable force adjustment was optimized using GQJS (Software of Analysis and Designing of Highway Bridges). Bonding of the steel plates and strengthening by external tendons were achieved, and some construction control targets and safety measures for stay cable force adjustment were provided after the rehabilitation of the tension rocker bearing cables. Adjustment steps and methods were also introduced. The corresponding calculations for the service stage of this bridge were presented. Construction monitoring results showed good force distribution of all stay cables; moreover, the alignment of its main girder was improved after stay cable force adjustment. Concrete stresses, displacement at the top of pylons, and forces of tension rocker bearing cables were also considered. The desired structural goals were achieved in the construction control of the stay cable force adjustment, thereby ensuring structural safety.
    • Download: (1.318Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Post-rehabilitation Cable Force Adjustment of the Tension Rocker Bearing in a PC Cable-stayed Bridge

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/70883
    Collections
    • Journal of Highway and Transportation Research and Development (English Edition)

    Show full item record

    contributor authorChen Yun-hai
    contributor authorLi Hong-jiang
    contributor authorLü Jian-ming
    date accessioned2017-05-08T22:05:09Z
    date available2017-05-08T22:05:09Z
    date copyrightJune 2013
    date issued2013
    identifier otherjhtrcq%2E0000315.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70883
    description abstractTaking the maintenance of a PC cable-stayed bridge as the background, a simulation and calculation analysis of construction control was conducted, and the scheme of stay cable force adjustment was optimized using GQJS (Software of Analysis and Designing of Highway Bridges). Bonding of the steel plates and strengthening by external tendons were achieved, and some construction control targets and safety measures for stay cable force adjustment were provided after the rehabilitation of the tension rocker bearing cables. Adjustment steps and methods were also introduced. The corresponding calculations for the service stage of this bridge were presented. Construction monitoring results showed good force distribution of all stay cables; moreover, the alignment of its main girder was improved after stay cable force adjustment. Concrete stresses, displacement at the top of pylons, and forces of tension rocker bearing cables were also considered. The desired structural goals were achieved in the construction control of the stay cable force adjustment, thereby ensuring structural safety.
    publisherAmerican Society of Civil Engineers
    titlePost-rehabilitation Cable Force Adjustment of the Tension Rocker Bearing in a PC Cable-stayed Bridge
    typeJournal Paper
    journal volume7
    journal issue2
    journal titleJournal of Highway and Transportation Research and Development (English Edition)
    identifier doi10.1061/JHTRCQ.0000315
    treeJournal of Highway and Transportation Research and Development (English Edition):;2013:;Volume ( 007 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian