YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Behavior of Double Down-side Drifts in a Weak Tunnel with Shallow Cover

    Source: Journal of Highway and Transportation Research and Development (English Edition):;2010:;Volume ( 004 ):;issue: 002
    Author:
    An Yonglin
    ,
    Peng Limin
    ,
    Zhao Dan
    DOI: 10.1061/JHTRCQ.0000294
    Publisher: American Society of Civil Engineers
    Abstract: Confronted with accidents in a shallow-buried weak tunnel using the bench excavation method, such as great subsidence and cracks in the ground surface as well as those in the preliminary support, a double downside drifts construction method was presented. The drifts were used to detect geological conditions and reinforce the lower parts of the tunnel. Its construction procedures and load transiting mechanism were then described. Its Construction behavior was also studied by numerical simulation using software MIDAS. The results show that (1) double-side drifts can improve tunnel load, the key construction step is arch ring excavation and core soil is good to keep tunnel steady; (2) weak parts mainly locate at wall foot of drifts, wall foot and crown foot of tunnel, and the connections; (3) reinforcement of soil under the drifts has no apparent effect on improving rock deformation and support load. Advice on construction was proposed that main parts to be reinforced are drifts (its foot depth, connection parts with tunnel, and its corners) and core soil should be kept if rock is unsteady and needs reinforcing.
    • Download: (1.011Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Construction Behavior of Double Down-side Drifts in a Weak Tunnel with Shallow Cover

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/70860
    Collections
    • Journal of Highway and Transportation Research and Development (English Edition)

    Show full item record

    contributor authorAn Yonglin
    contributor authorPeng Limin
    contributor authorZhao Dan
    date accessioned2017-05-08T22:05:07Z
    date available2017-05-08T22:05:07Z
    date copyrightJuly 2010
    date issued2010
    identifier otherjhtrcq%2E0000294.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70860
    description abstractConfronted with accidents in a shallow-buried weak tunnel using the bench excavation method, such as great subsidence and cracks in the ground surface as well as those in the preliminary support, a double downside drifts construction method was presented. The drifts were used to detect geological conditions and reinforce the lower parts of the tunnel. Its construction procedures and load transiting mechanism were then described. Its Construction behavior was also studied by numerical simulation using software MIDAS. The results show that (1) double-side drifts can improve tunnel load, the key construction step is arch ring excavation and core soil is good to keep tunnel steady; (2) weak parts mainly locate at wall foot of drifts, wall foot and crown foot of tunnel, and the connections; (3) reinforcement of soil under the drifts has no apparent effect on improving rock deformation and support load. Advice on construction was proposed that main parts to be reinforced are drifts (its foot depth, connection parts with tunnel, and its corners) and core soil should be kept if rock is unsteady and needs reinforcing.
    publisherAmerican Society of Civil Engineers
    titleConstruction Behavior of Double Down-side Drifts in a Weak Tunnel with Shallow Cover
    typeJournal Paper
    journal volume4
    journal issue2
    journal titleJournal of Highway and Transportation Research and Development (English Edition)
    identifier doi10.1061/JHTRCQ.0000294
    treeJournal of Highway and Transportation Research and Development (English Edition):;2010:;Volume ( 004 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian