| contributor author | Armando Carravetta | |
| contributor author | Oreste Fecarotta | |
| contributor author | Marco Sinagra | |
| contributor author | Tullio Tucciarelli | |
| date accessioned | 2017-05-08T22:03:53Z | |
| date available | 2017-05-08T22:03:53Z | |
| date copyright | June 2014 | |
| date issued | 2014 | |
| identifier other | %28asce%29ww%2E1943-5460%2E0000002.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/70244 | |
| description abstract | The use of microhydroelectric plants in urban pipe networks, based on the combination of a pump as turbine (PAT), two regulating valves, and two pressure meters, is proposed along with simple automation rules. Its economic benefit is tested on a small pipe network, where the network geometry as well as the demand coefficient variation in time and space have been inferred from previously collected data and existing analysis. A similar analysis has been also carried out for different scenarios in which the reduction of pipe installation cost due to a diameter reduction is compared with the increased benefit in energy production. The case study shows that a small increment of the pipe installation cost, with respect to the minimum required by the nodes minimum pressure, can lead to a larger benefit for energy production. | |
| publisher | American Society of Civil Engineers | |
| title | Cost-Benefit Analysis for Hydropower Production in Water Distribution Networks by a Pump as Turbine | |
| type | Journal Paper | |
| journal volume | 140 | |
| journal issue | 6 | |
| journal title | Journal of Water Resources Planning and Management | |
| identifier doi | 10.1061/(ASCE)WR.1943-5452.0000384 | |
| tree | Journal of Water Resources Planning and Management:;2014:;Volume ( 140 ):;issue: 006 | |
| contenttype | Fulltext | |