YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Flood-Damage-Reduction Project Evaluation with Explicit Consideration of Damage Cost Uncertainty

    Source: Journal of Water Resources Planning and Management:;2013:;Volume ( 139 ):;issue: 006
    Author:
    Hsin-Ting Su
    ,
    Yeou-Koung Tung
    DOI: 10.1061/(ASCE)WR.1943-5452.0000291
    Publisher: American Society of Civil Engineers
    Abstract: Facing uncertain future conditions, flood-damage-reduction alternatives with large positive expected net benefits may be accompanied with high uncertainty. In decision-making under uncertainty, not only failure probability and failure consequences but also the cost of lost opportunity should be considered so as to enhance risk-informed decision-making for hydrosystem design, planning, and management. This paper proposes a risk measure, i.e., the expected opportunity loss (EOL), in a risk-based framework for flood-damage-reduction project design. The opportunity loss for a chosen alternative is the difference between the payoffs of this alternative and the best payoff of all alternatives. The risk measure of EOL can quantify the adverse consequences associated with making a wrong decision due to the uncertain state of nature and it can also capture the correlation effect of the net benefits of two competing design alternatives. Using EOL, alternatives can be ranked by the minimax regret principle. The acceptable risk of the decision maker is conceptually compatible with EOL and can be used to test the feasibility of the design alternatives under consideration. An example based on a case study for flood damage reduction is used to demonstrate the application of the proposed risk-based decision-making model. The example application shows that the uncertainty of the project net benefits is significant, and thus the explicit consideration of tradeoffs between the project risks and net benefits is essential. Furthermore, the example also shows that the uncertainty and correlation between the net benefit in different projects can have a significant influence on the ranking of alternatives.
    • Download: (5.651Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Flood-Damage-Reduction Project Evaluation with Explicit Consideration of Damage Cost Uncertainty

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/70156
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorHsin-Ting Su
    contributor authorYeou-Koung Tung
    date accessioned2017-05-08T22:03:38Z
    date available2017-05-08T22:03:38Z
    date copyrightNovember 2013
    date issued2013
    identifier other%28asce%29wr%2E1943-5452%2E0000343.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70156
    description abstractFacing uncertain future conditions, flood-damage-reduction alternatives with large positive expected net benefits may be accompanied with high uncertainty. In decision-making under uncertainty, not only failure probability and failure consequences but also the cost of lost opportunity should be considered so as to enhance risk-informed decision-making for hydrosystem design, planning, and management. This paper proposes a risk measure, i.e., the expected opportunity loss (EOL), in a risk-based framework for flood-damage-reduction project design. The opportunity loss for a chosen alternative is the difference between the payoffs of this alternative and the best payoff of all alternatives. The risk measure of EOL can quantify the adverse consequences associated with making a wrong decision due to the uncertain state of nature and it can also capture the correlation effect of the net benefits of two competing design alternatives. Using EOL, alternatives can be ranked by the minimax regret principle. The acceptable risk of the decision maker is conceptually compatible with EOL and can be used to test the feasibility of the design alternatives under consideration. An example based on a case study for flood damage reduction is used to demonstrate the application of the proposed risk-based decision-making model. The example application shows that the uncertainty of the project net benefits is significant, and thus the explicit consideration of tradeoffs between the project risks and net benefits is essential. Furthermore, the example also shows that the uncertainty and correlation between the net benefit in different projects can have a significant influence on the ranking of alternatives.
    publisherAmerican Society of Civil Engineers
    titleFlood-Damage-Reduction Project Evaluation with Explicit Consideration of Damage Cost Uncertainty
    typeJournal Paper
    journal volume139
    journal issue6
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000291
    treeJournal of Water Resources Planning and Management:;2013:;Volume ( 139 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian