YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Estimating Maximal Annual Energy Given Heterogeneous Hydropower Generating Units with Application to the Three Gorges System

    Source: Journal of Water Resources Planning and Management:;2013:;Volume ( 139 ):;issue: 003
    Author:
    Fang-Fang Li
    ,
    Christine A. Shoemaker
    ,
    Jia-Hua Wei
    ,
    Xu-Dong Fu
    DOI: 10.1061/(ASCE)WR.1943-5452.0000250
    Publisher: American Society of Civil Engineers
    Abstract: A hierarchical optimization method is presented for an assessment of the potential maximum energy output of the Three Gorges Project and Gezhouba cascade hydropower stations in China. The optimization incorporates a detailed description of daily load dispatching among different types of hydropower units. The optimization method is divided into three levels to render feasible the computation of the global optimization problem. In levels 1 and 2, a genetic algorithm is applied to optimize discharge and water head distribution between the upstream and downstream reservoirs. Level 1 selects the water levels at the beginning of each month in a year. Level 2 selects the water levels at the beginning of each day in a month. Level 3 solves a linear programming problem for allocation of water among the heterogeneous types of hydropower generation. Hydrological data of the years 2004 and 2005 are used to perform an optimized power generation process within the operating rules. The maximal annual energy production could be approximately 61 and 87 MWh higher than the actual recorded energy production in 2004 and 2005, respectively.
    • Download: (47.31Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Estimating Maximal Annual Energy Given Heterogeneous Hydropower Generating Units with Application to the Three Gorges System

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/70113
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorFang-Fang Li
    contributor authorChristine A. Shoemaker
    contributor authorJia-Hua Wei
    contributor authorXu-Dong Fu
    date accessioned2017-05-08T22:03:29Z
    date available2017-05-08T22:03:29Z
    date copyrightMay 2013
    date issued2013
    identifier other%28asce%29wr%2E1943-5452%2E0000297.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70113
    description abstractA hierarchical optimization method is presented for an assessment of the potential maximum energy output of the Three Gorges Project and Gezhouba cascade hydropower stations in China. The optimization incorporates a detailed description of daily load dispatching among different types of hydropower units. The optimization method is divided into three levels to render feasible the computation of the global optimization problem. In levels 1 and 2, a genetic algorithm is applied to optimize discharge and water head distribution between the upstream and downstream reservoirs. Level 1 selects the water levels at the beginning of each month in a year. Level 2 selects the water levels at the beginning of each day in a month. Level 3 solves a linear programming problem for allocation of water among the heterogeneous types of hydropower generation. Hydrological data of the years 2004 and 2005 are used to perform an optimized power generation process within the operating rules. The maximal annual energy production could be approximately 61 and 87 MWh higher than the actual recorded energy production in 2004 and 2005, respectively.
    publisherAmerican Society of Civil Engineers
    titleEstimating Maximal Annual Energy Given Heterogeneous Hydropower Generating Units with Application to the Three Gorges System
    typeJournal Paper
    journal volume139
    journal issue3
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000250
    treeJournal of Water Resources Planning and Management:;2013:;Volume ( 139 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian