YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quarter-Hourly Operation of Hydropower Reservoirs with Pumped Storage Plants

    Source: Journal of Water Resources Planning and Management:;2012:;Volume ( 138 ):;issue: 001
    Author:
    Jinwen Wang
    ,
    Shuangquan Liu
    DOI: 10.1061/(ASCE)WR.1943-5452.0000143
    Publisher: American Society of Civil Engineers
    Abstract: This paper formulates a short-term operation problem to determine the optimal quarter-hourly generation schedules of multiple hydropower reservoirs with pumped-storage plants. The model is a comprehensive one that incorporates the plant-based operating zones (PBOZ), the upper and lower bounds on hydrowide power, the hydraulic coupling, and the requirements for generating power and releasing water with a fluctuation tolerance. A new procedure that includes three key techniques makes the problem easier to solve. First, the original problem is temporally decomposed into several quarter-hourly reservoir operation subproblems by dividing the planning horizon into subhorizons. Second, the plant-based operating zones that are integer variables are separately determined with dynamic programming (DP) after solving an hourly reservoir operation problem, which also derives a target-guiding trajectory for the subproblems. Third, iteratively linearizing the constraints simplifies the problems and having nonlinear objective functions guarantees the convergence of the procedure. As part of the software developed for Wuling Power Cooperation, Ltd., the present model and procedure are practical and efficient in aiding users in operating the reservoirs and scheduling the hydropower generation.
    • Download: (39.59Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quarter-Hourly Operation of Hydropower Reservoirs with Pumped Storage Plants

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/69999
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorJinwen Wang
    contributor authorShuangquan Liu
    date accessioned2017-05-08T22:03:17Z
    date available2017-05-08T22:03:17Z
    date copyrightJanuary 2012
    date issued2012
    identifier other%28asce%29wr%2E1943-5452%2E0000189.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69999
    description abstractThis paper formulates a short-term operation problem to determine the optimal quarter-hourly generation schedules of multiple hydropower reservoirs with pumped-storage plants. The model is a comprehensive one that incorporates the plant-based operating zones (PBOZ), the upper and lower bounds on hydrowide power, the hydraulic coupling, and the requirements for generating power and releasing water with a fluctuation tolerance. A new procedure that includes three key techniques makes the problem easier to solve. First, the original problem is temporally decomposed into several quarter-hourly reservoir operation subproblems by dividing the planning horizon into subhorizons. Second, the plant-based operating zones that are integer variables are separately determined with dynamic programming (DP) after solving an hourly reservoir operation problem, which also derives a target-guiding trajectory for the subproblems. Third, iteratively linearizing the constraints simplifies the problems and having nonlinear objective functions guarantees the convergence of the procedure. As part of the software developed for Wuling Power Cooperation, Ltd., the present model and procedure are practical and efficient in aiding users in operating the reservoirs and scheduling the hydropower generation.
    publisherAmerican Society of Civil Engineers
    titleQuarter-Hourly Operation of Hydropower Reservoirs with Pumped Storage Plants
    typeJournal Paper
    journal volume138
    journal issue1
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000143
    treeJournal of Water Resources Planning and Management:;2012:;Volume ( 138 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian