YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Urban Planning and Development
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Urban Planning and Development
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk Factors of Public-Private Partnership Projects in China: Comparison between the Water, Power, and Transportation Sectors

    Source: Journal of Urban Planning and Development:;2011:;Volume ( 137 ):;issue: 004
    Author:
    Esther Cheung
    ,
    Albert P. C. Chan
    DOI: 10.1061/(ASCE)UP.1943-5444.0000086
    Publisher: American Society of Civil Engineers
    Abstract: With the growing economic development experienced in China, there is an urge for more and better public infrastructure. Public-private partnership (PPP) is an innovative method for delivering these facilities and services. However, along with this method there are certain risk factors that exist or are more severe when compared to the traditional delivery method. This paper considers three types of common public projects in China that are often delivered by the PPP method, including water and wastewater, power and energy, and transportation. For each type of project, experienced practitioners in China were asked to rank the severity of 20 risk factors sought from a comprehensive literature review. The top five most severe risk factors for each type of project were considered. Government intervention and public credit were ranked severe for all three types of projects. The findings indicate that the most severe risks are government-related. It appears that the stakeholders have low confidence in the government. These findings have highlighted the severity of risk factors for common types of PPP projects in China. With this information, both public and private parties can be more aware of which risk factors would be the most severe for certain projects. As a result, appropriate precautions can be made to avoid or minimize the likelihood and consequences of these risks. By doing so, PPP projects can be carried out more successfully, and their further use can be encouraged in China. PPP stakeholders from other countries can also use the findings presented in this paper to prevent the occurrence of potential risks. Furthermore, the methodology adopted in this paper can easily be adopted for other countries.
    • Download: (643.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk Factors of Public-Private Partnership Projects in China: Comparison between the Water, Power, and Transportation Sectors

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/69756
    Collections
    • Journal of Urban Planning and Development

    Show full item record

    contributor authorEsther Cheung
    contributor authorAlbert P. C. Chan
    date accessioned2017-05-08T22:02:48Z
    date available2017-05-08T22:02:48Z
    date copyrightDecember 2011
    date issued2011
    identifier other%28asce%29up%2E1943-5444%2E0000130.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69756
    description abstractWith the growing economic development experienced in China, there is an urge for more and better public infrastructure. Public-private partnership (PPP) is an innovative method for delivering these facilities and services. However, along with this method there are certain risk factors that exist or are more severe when compared to the traditional delivery method. This paper considers three types of common public projects in China that are often delivered by the PPP method, including water and wastewater, power and energy, and transportation. For each type of project, experienced practitioners in China were asked to rank the severity of 20 risk factors sought from a comprehensive literature review. The top five most severe risk factors for each type of project were considered. Government intervention and public credit were ranked severe for all three types of projects. The findings indicate that the most severe risks are government-related. It appears that the stakeholders have low confidence in the government. These findings have highlighted the severity of risk factors for common types of PPP projects in China. With this information, both public and private parties can be more aware of which risk factors would be the most severe for certain projects. As a result, appropriate precautions can be made to avoid or minimize the likelihood and consequences of these risks. By doing so, PPP projects can be carried out more successfully, and their further use can be encouraged in China. PPP stakeholders from other countries can also use the findings presented in this paper to prevent the occurrence of potential risks. Furthermore, the methodology adopted in this paper can easily be adopted for other countries.
    publisherAmerican Society of Civil Engineers
    titleRisk Factors of Public-Private Partnership Projects in China: Comparison between the Water, Power, and Transportation Sectors
    typeJournal Paper
    journal volume137
    journal issue4
    journal titleJournal of Urban Planning and Development
    identifier doi10.1061/(ASCE)UP.1943-5444.0000086
    treeJournal of Urban Planning and Development:;2011:;Volume ( 137 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian