YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Hazard-Based Analysis of Highway Project Development Times

    Source: Journal of Transportation Engineering, Part A: Systems:;2012:;Volume ( 138 ):;issue: 010
    Author:
    G. P. Ong
    ,
    V. Fitzpatrick
    ,
    S. Labi
    ,
    K. C. Sinha
    DOI: 10.1061/(ASCE)TE.1943-5436.0000422
    Publisher: American Society of Civil Engineers
    Abstract: Transport agencies around the world recognize the importance of on-time on-budget delivery of highway projects and understand the need for an efficient transport development process. Past studies of highway project duration and cost estimation were focused on construction, and few studies have focused on preconstruction project delivery from an agency’s perspective. This paper proposes the use of hazard-based duration models for investigating the potential risk factors that could affect project development time from planning to letting. A database containing over 35 years of highway project data from the state of Indiana was used to develop appropriate models. Of the three model forms (Weibull, Weibull with gamma heterogeneity, and log-logistic) considered in the paper, it was found that the log-logistic model is the most appropriate for modeling project development time. For each work category (pavement, bridge, and road/interchange projects), risk factors were identified, and their influences on project development time (and consequently, on letting time) were investigated. The developed hazard-based duration models were further applied to demonstrate their ability to predict expected project development time for delivery and the project-related factors that influence this duration, thereby providing the agency with a useful interpretation of associated delivery risks.
    • Download: (627.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Hazard-Based Analysis of Highway Project Development Times

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/69438
    Collections
    • Journal of Transportation Engineering, Part A: Systems

    Show full item record

    contributor authorG. P. Ong
    contributor authorV. Fitzpatrick
    contributor authorS. Labi
    contributor authorK. C. Sinha
    date accessioned2017-05-08T22:02:14Z
    date available2017-05-08T22:02:14Z
    date copyrightOctober 2012
    date issued2012
    identifier other%28asce%29te%2E1943-5436%2E0000465.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69438
    description abstractTransport agencies around the world recognize the importance of on-time on-budget delivery of highway projects and understand the need for an efficient transport development process. Past studies of highway project duration and cost estimation were focused on construction, and few studies have focused on preconstruction project delivery from an agency’s perspective. This paper proposes the use of hazard-based duration models for investigating the potential risk factors that could affect project development time from planning to letting. A database containing over 35 years of highway project data from the state of Indiana was used to develop appropriate models. Of the three model forms (Weibull, Weibull with gamma heterogeneity, and log-logistic) considered in the paper, it was found that the log-logistic model is the most appropriate for modeling project development time. For each work category (pavement, bridge, and road/interchange projects), risk factors were identified, and their influences on project development time (and consequently, on letting time) were investigated. The developed hazard-based duration models were further applied to demonstrate their ability to predict expected project development time for delivery and the project-related factors that influence this duration, thereby providing the agency with a useful interpretation of associated delivery risks.
    publisherAmerican Society of Civil Engineers
    titleHazard-Based Analysis of Highway Project Development Times
    typeJournal Paper
    journal volume138
    journal issue10
    journal titleJournal of Transportation Engineering, Part A: Systems
    identifier doi10.1061/(ASCE)TE.1943-5436.0000422
    treeJournal of Transportation Engineering, Part A: Systems:;2012:;Volume ( 138 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian