YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Financial Consequences of Delaying Pavement Rehabilitation: Case Study Using LTPP Data

    Source: Journal of Transportation Engineering, Part A: Systems:;2012:;Volume ( 138 ):;issue: 008
    Author:
    Ying Xu
    ,
    Yi-Chang Tsai
    DOI: 10.1061/(ASCE)TE.1943-5436.0000387
    Publisher: American Society of Civil Engineers
    Abstract: Transportation agencies have suffered stringent funding shortages for the past several years. As a result, many pavement preservation and rehabilitation projects have been substantially delayed. The financial consequences of delaying pavement rehabilitation need to be quantified so funding needs can be justified scientifically. Although studies on the basis of hypothetical data have been conducted to evaluate the effect of delaying treatments, there is no research using actual data to quantify the financial consequences of delaying pavement rehabilitation. This study is motivated by the need to remedy this situation. A method that quantifies the financial consequences of delaying rehabilitation using real-world data is proposed. The proposed method uses life-cycle-cost analysis (LCCA) and a composite performance indicator, pavement condition rating (PCR), to determine the treatment timing. The proposed method is validated using actual pavement performance data and maintenance history from the long-term pavement performance (LTPP) specific pavement studies-5 (SPS-5) in California. These pavement sections have the same pavement structure, traffic volume, environmental features, and similar rehabilitation treatments, but they have different treatment timings. Their annual life-cycle costs are computed and compared to quantitatively evaluate the financial consequences of delaying treatment. Preliminary results show that delaying rehabilitation of pavement sections (prerehabilitation
    • Download: (1.358Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Financial Consequences of Delaying Pavement Rehabilitation: Case Study Using LTPP Data

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/69400
    Collections
    • Journal of Transportation Engineering, Part A: Systems

    Show full item record

    contributor authorYing Xu
    contributor authorYi-Chang Tsai
    date accessioned2017-05-08T22:02:11Z
    date available2017-05-08T22:02:11Z
    date copyrightAugust 2012
    date issued2012
    identifier other%28asce%29te%2E1943-5436%2E0000429.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69400
    description abstractTransportation agencies have suffered stringent funding shortages for the past several years. As a result, many pavement preservation and rehabilitation projects have been substantially delayed. The financial consequences of delaying pavement rehabilitation need to be quantified so funding needs can be justified scientifically. Although studies on the basis of hypothetical data have been conducted to evaluate the effect of delaying treatments, there is no research using actual data to quantify the financial consequences of delaying pavement rehabilitation. This study is motivated by the need to remedy this situation. A method that quantifies the financial consequences of delaying rehabilitation using real-world data is proposed. The proposed method uses life-cycle-cost analysis (LCCA) and a composite performance indicator, pavement condition rating (PCR), to determine the treatment timing. The proposed method is validated using actual pavement performance data and maintenance history from the long-term pavement performance (LTPP) specific pavement studies-5 (SPS-5) in California. These pavement sections have the same pavement structure, traffic volume, environmental features, and similar rehabilitation treatments, but they have different treatment timings. Their annual life-cycle costs are computed and compared to quantitatively evaluate the financial consequences of delaying treatment. Preliminary results show that delaying rehabilitation of pavement sections (prerehabilitation
    publisherAmerican Society of Civil Engineers
    titleFinancial Consequences of Delaying Pavement Rehabilitation: Case Study Using LTPP Data
    typeJournal Paper
    journal volume138
    journal issue8
    journal titleJournal of Transportation Engineering, Part A: Systems
    identifier doi10.1061/(ASCE)TE.1943-5436.0000387
    treeJournal of Transportation Engineering, Part A: Systems:;2012:;Volume ( 138 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian