YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Incorporating Priority Preferences into Pavement Maintenance Programming

    Source: Journal of Transportation Engineering, Part A: Systems:;2012:;Volume ( 138 ):;issue: 006
    Author:
    J. Farhan
    ,
    T. F. Fwa
    DOI: 10.1061/(ASCE)TE.1943-5436.0000372
    Publisher: American Society of Civil Engineers
    Abstract: Traditionally, it has been a common practice to apply priority weights to selected parameters in the process of optimal programming of pavement maintenance. However, there are several issues associated with this approach of incorporating priority preferences into pavement maintenance programming. For instance, applying priority weights to selected problem parameters will lead to a suboptimal solution with respect to the original objective function (such as minimal total maintenance cost or maximum pavement condition). The decision makers may not be aware of this consequence and the magnitude of loss in optimality caused by their choice of priority scheme. This paper proposes an improved methodology of incorporating priority preferences into pavement maintenance programming to overcome these problems. Instead of applying priority weights directly into the mathematical formulation of maintenance programming, priority preferences are handled in two stages of postprocessing of the optimal programming process, namely, a tie-breaking analysis and a trade-off analysis. The optimal programming problem is first solved without applying priority weights to any parameters of the problem. This ensures that the optimality of the solution is not disturbed. In the tie-breaking postprocessing, prioritized maintenance activities are identified to replace lower-priority activities in the solution without affecting the optimality of the solution. Finally, a trade-off analysis is performed to introduce more prioritized activities into the solution on the basis of the willingness of the highway agency to accept some loss in optimality.
    • Download: (712.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Incorporating Priority Preferences into Pavement Maintenance Programming

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/69382
    Collections
    • Journal of Transportation Engineering, Part A: Systems

    Show full item record

    contributor authorJ. Farhan
    contributor authorT. F. Fwa
    date accessioned2017-05-08T22:02:09Z
    date available2017-05-08T22:02:09Z
    date copyrightJune 2012
    date issued2012
    identifier other%28asce%29te%2E1943-5436%2E0000414.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69382
    description abstractTraditionally, it has been a common practice to apply priority weights to selected parameters in the process of optimal programming of pavement maintenance. However, there are several issues associated with this approach of incorporating priority preferences into pavement maintenance programming. For instance, applying priority weights to selected problem parameters will lead to a suboptimal solution with respect to the original objective function (such as minimal total maintenance cost or maximum pavement condition). The decision makers may not be aware of this consequence and the magnitude of loss in optimality caused by their choice of priority scheme. This paper proposes an improved methodology of incorporating priority preferences into pavement maintenance programming to overcome these problems. Instead of applying priority weights directly into the mathematical formulation of maintenance programming, priority preferences are handled in two stages of postprocessing of the optimal programming process, namely, a tie-breaking analysis and a trade-off analysis. The optimal programming problem is first solved without applying priority weights to any parameters of the problem. This ensures that the optimality of the solution is not disturbed. In the tie-breaking postprocessing, prioritized maintenance activities are identified to replace lower-priority activities in the solution without affecting the optimality of the solution. Finally, a trade-off analysis is performed to introduce more prioritized activities into the solution on the basis of the willingness of the highway agency to accept some loss in optimality.
    publisherAmerican Society of Civil Engineers
    titleIncorporating Priority Preferences into Pavement Maintenance Programming
    typeJournal Paper
    journal volume138
    journal issue6
    journal titleJournal of Transportation Engineering, Part A: Systems
    identifier doi10.1061/(ASCE)TE.1943-5436.0000372
    treeJournal of Transportation Engineering, Part A: Systems:;2012:;Volume ( 138 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian