YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Environmental Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Environmental Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Simultaneous Removal of Nitrogen and Phosphorous from Municipal Wastewater Using Continuous-Flow Integrated Biological Reactor

    Source: Journal of Environmental Engineering:;2008:;Volume ( 134 ):;issue: 003
    Author:
    Lixiang Liu
    ,
    Beiping Zhang
    ,
    Xiaohui Wu
    ,
    Gang Yan
    ,
    Xiejuan Lu
    DOI: 10.1061/(ASCE)0733-9372(2008)134:3(169)
    Publisher: American Society of Civil Engineers
    Abstract: A pilot-scale experiment was carried out to study the simultaneous removal of nitrogen and phosphorous from municipal wastewater by an innovative continuous-flow integrated biological reactor (CIBR) process. A three-phase separator was used in the CIBR process, which not only saved energy consumption of sludge returning, but also solved the sludge–gas separating problem. The optimal working condition was
    • Download: (583.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Simultaneous Removal of Nitrogen and Phosphorous from Municipal Wastewater Using Continuous-Flow Integrated Biological Reactor

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/68553
    Collections
    • Journal of Environmental Engineering

    Show full item record

    contributor authorLixiang Liu
    contributor authorBeiping Zhang
    contributor authorXiaohui Wu
    contributor authorGang Yan
    contributor authorXiejuan Lu
    date accessioned2017-05-08T22:00:00Z
    date available2017-05-08T22:00:00Z
    date copyrightMarch 2008
    date issued2008
    identifier other%28asce%290733-9372%282008%29134%3A3%28169%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/68553
    description abstractA pilot-scale experiment was carried out to study the simultaneous removal of nitrogen and phosphorous from municipal wastewater by an innovative continuous-flow integrated biological reactor (CIBR) process. A three-phase separator was used in the CIBR process, which not only saved energy consumption of sludge returning, but also solved the sludge–gas separating problem. The optimal working condition was
    publisherAmerican Society of Civil Engineers
    titleSimultaneous Removal of Nitrogen and Phosphorous from Municipal Wastewater Using Continuous-Flow Integrated Biological Reactor
    typeJournal Paper
    journal volume134
    journal issue3
    journal titleJournal of Environmental Engineering
    identifier doi10.1061/(ASCE)0733-9372(2008)134:3(169)
    treeJournal of Environmental Engineering:;2008:;Volume ( 134 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian