YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk Evaluation for Maxi Horizontal Directional Drilling Crossing Projects

    Source: Journal of Pipeline Systems Engineering and Practice:;2010:;Volume ( 001 ):;issue: 002
    Author:
    Baosong Ma
    ,
    Mohammad Najafi
    ,
    Hua Shen
    ,
    Langhui Wu
    DOI: 10.1061/(ASCE)PS.1949-1204.0000046
    Publisher: American Society of Civil Engineers
    Abstract: Horizontal directional drilling (HDD) has become increasingly used for the construction of large diameter (more than 600 mm or 24 in.) pipeline projects throughout China. Due to the large investment of capital and resources, it is important to conduct a risk evaluation prior to actual construction. However, there are relatively few appropriate analyses or investigations available for such applications. This paper addresses the risk assessment for Maxi HDD projects. The combination of the fuzzy comprehensive evaluation method and analytical hierarchy process was adopted as the basic model. The corresponding risk indices were constructed considering the factors affecting the projects and based on discussions with experts who have conducted HDD crossing projects. Structured judgment matrices and membership matrices were then directly developed from the index systems, and the weight vectors, subordinated vectors, and risk values determined by the use of Matlab software. Finally, the risk level of the projects was obtained by implementing the maximum membership degree law. The synthesis of the fuzzy comprehensive evaluation method and analytical hierarchy process has been demonstrated to provide a theoretical basis for the risk evaluation and establishment of risk control measures for Maxi HDD projects.
    • Download: (1.836Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk Evaluation for Maxi Horizontal Directional Drilling Crossing Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/67603
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    Show full item record

    contributor authorBaosong Ma
    contributor authorMohammad Najafi
    contributor authorHua Shen
    contributor authorLanghui Wu
    date accessioned2017-05-08T21:57:57Z
    date available2017-05-08T21:57:57Z
    date copyrightMay 2010
    date issued2010
    identifier other%28asce%29ps%2E1949-1204%2E0000096.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/67603
    description abstractHorizontal directional drilling (HDD) has become increasingly used for the construction of large diameter (more than 600 mm or 24 in.) pipeline projects throughout China. Due to the large investment of capital and resources, it is important to conduct a risk evaluation prior to actual construction. However, there are relatively few appropriate analyses or investigations available for such applications. This paper addresses the risk assessment for Maxi HDD projects. The combination of the fuzzy comprehensive evaluation method and analytical hierarchy process was adopted as the basic model. The corresponding risk indices were constructed considering the factors affecting the projects and based on discussions with experts who have conducted HDD crossing projects. Structured judgment matrices and membership matrices were then directly developed from the index systems, and the weight vectors, subordinated vectors, and risk values determined by the use of Matlab software. Finally, the risk level of the projects was obtained by implementing the maximum membership degree law. The synthesis of the fuzzy comprehensive evaluation method and analytical hierarchy process has been demonstrated to provide a theoretical basis for the risk evaluation and establishment of risk control measures for Maxi HDD projects.
    publisherAmerican Society of Civil Engineers
    titleRisk Evaluation for Maxi Horizontal Directional Drilling Crossing Projects
    typeJournal Paper
    journal volume1
    journal issue2
    journal titleJournal of Pipeline Systems Engineering and Practice
    identifier doi10.1061/(ASCE)PS.1949-1204.0000046
    treeJournal of Pipeline Systems Engineering and Practice:;2010:;Volume ( 001 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian