YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Natural Hazards Review
    • View Item
    •   YE&T Library
    • ASCE
    • Natural Hazards Review
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk-Based Strategies for Upgrading Existing Nonconforming Wooden Houses and Risk Information for Promoting Upgrading

    Source: Natural Hazards Review:;2012:;Volume ( 013 ):;issue: 003
    Author:
    Yasuhiro Mori
    ,
    Takeshi Yamaguchi
    ,
    Hideki Idota
    DOI: 10.1061/(ASCE)NH.1527-6996.0000069
    Publisher: American Society of Civil Engineers
    Abstract: There is widespread awareness in seismic-prone countries about the necessity to upgrade the seismic performance of old buildings and wooden houses for disaster mitigation; however, upgrading occurs at a very slow pace. At present, Japan has approximately 11 million nonconforming old wooden houses, but most of them remain without upgrade because of the large expenditure that would be incurred by both house owners and the local government. An owner would need to spend approximately US$11,000 on average to upgrade his/her house such that it satisfies the current design requirements. In Aichi prefecture alone, upgrading would cost approximately US$10 billion in total, which is approximately 40% of the annual budget. This study, therefore, investigates alternative strategies for upgrading existing nonconforming wooden houses more efficiently and cost-effectively. The seismic risks of wooden houses as a whole in Aichi prefecture are estimated, and then the effective target level for upgrading is discussed from the viewpoint of both economic loss and the number of fatalities. It is shown here that it is worthwhile from the viewpoint of life safety to consider a target upgrading level that is lower than the current design requirements. Although the analytical models discussed in this paper might be specific to Japan, the framework of the risk assessment is universal and the conclusions drawn from this analysis are applicable to other seismic-prone regions and countries.
    • Download: (1.668Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk-Based Strategies for Upgrading Existing Nonconforming Wooden Houses and Risk Information for Promoting Upgrading

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/67466
    Collections
    • Natural Hazards Review

    Show full item record

    contributor authorYasuhiro Mori
    contributor authorTakeshi Yamaguchi
    contributor authorHideki Idota
    date accessioned2017-05-08T21:57:39Z
    date available2017-05-08T21:57:39Z
    date copyrightAugust 2012
    date issued2012
    identifier other%28asce%29nh%2E1527-6996%2E0000109.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/67466
    description abstractThere is widespread awareness in seismic-prone countries about the necessity to upgrade the seismic performance of old buildings and wooden houses for disaster mitigation; however, upgrading occurs at a very slow pace. At present, Japan has approximately 11 million nonconforming old wooden houses, but most of them remain without upgrade because of the large expenditure that would be incurred by both house owners and the local government. An owner would need to spend approximately US$11,000 on average to upgrade his/her house such that it satisfies the current design requirements. In Aichi prefecture alone, upgrading would cost approximately US$10 billion in total, which is approximately 40% of the annual budget. This study, therefore, investigates alternative strategies for upgrading existing nonconforming wooden houses more efficiently and cost-effectively. The seismic risks of wooden houses as a whole in Aichi prefecture are estimated, and then the effective target level for upgrading is discussed from the viewpoint of both economic loss and the number of fatalities. It is shown here that it is worthwhile from the viewpoint of life safety to consider a target upgrading level that is lower than the current design requirements. Although the analytical models discussed in this paper might be specific to Japan, the framework of the risk assessment is universal and the conclusions drawn from this analysis are applicable to other seismic-prone regions and countries.
    publisherAmerican Society of Civil Engineers
    titleRisk-Based Strategies for Upgrading Existing Nonconforming Wooden Houses and Risk Information for Promoting Upgrading
    typeJournal Paper
    journal volume13
    journal issue3
    journal titleNatural Hazards Review
    identifier doi10.1061/(ASCE)NH.1527-6996.0000069
    treeNatural Hazards Review:;2012:;Volume ( 013 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian