YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Impact of Risk on Design-Build Selection for Highway Design and Construction Projects

    Source: Journal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 002
    Author:
    Dai Q. Tran
    ,
    Keith R. Molenaar
    DOI: 10.1061/(ASCE)ME.1943-5479.0000210
    Publisher: American Society of Civil Engineers
    Abstract: The design-build (DB) project delivery method continues to grow as a viable alternative delivery method for highway projects. The primary reason for selecting DB delivery is to take advantage of the time savings inherent in the process. However, because of low levels of design at the time of contract awards, DB contracts often carry more risks and uncertainties than other contracts, which makes the decision to select DB delivery complex. Applying risk analysis strategies and tools to the delivery selection process will help decision makers evaluate and select the DB delivery method consistently and defensibly. This paper examines 39 generic risk factors related to the DB delivery selection process. These risks were identified through previous research and risk analysis workshops on transportation projects worth more than $10 billion. To explore how these risks impact DB delivery selection, a questionnaire was developed to collect data from a national cross section of professionals with an average of 25 years of experience related to risk and project delivery methods in the transportation industry. An exploratory factor analysis was used to investigate the relationship between DB delivery selection and the 39 generic risk factors. The results indicate that seven delivery selection risk factors have the most influence on DB delivery selection: (1) scope risk; (2) third-party and complexity risk; (3) construction risk; (4) utility and right-of-way (ROW) risk; (5) level of design and contract risk; (6) management risk; and (7) regulation and railroad risk. This study compares risk preferences of public owners and design-builders for choosing DB delivery. Understanding these risk factors will help professionals not only select DB for appropriate projects but also allocate risks more properly in DB contracts.
    • Download: (1.765Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Impact of Risk on Design-Build Selection for Highway Design and Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/66266
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorDai Q. Tran
    contributor authorKeith R. Molenaar
    date accessioned2017-05-08T21:54:49Z
    date available2017-05-08T21:54:49Z
    date copyrightMarch 2014
    date issued2014
    identifier other%28asce%29me%2E1943-5479%2E0000245.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66266
    description abstractThe design-build (DB) project delivery method continues to grow as a viable alternative delivery method for highway projects. The primary reason for selecting DB delivery is to take advantage of the time savings inherent in the process. However, because of low levels of design at the time of contract awards, DB contracts often carry more risks and uncertainties than other contracts, which makes the decision to select DB delivery complex. Applying risk analysis strategies and tools to the delivery selection process will help decision makers evaluate and select the DB delivery method consistently and defensibly. This paper examines 39 generic risk factors related to the DB delivery selection process. These risks were identified through previous research and risk analysis workshops on transportation projects worth more than $10 billion. To explore how these risks impact DB delivery selection, a questionnaire was developed to collect data from a national cross section of professionals with an average of 25 years of experience related to risk and project delivery methods in the transportation industry. An exploratory factor analysis was used to investigate the relationship between DB delivery selection and the 39 generic risk factors. The results indicate that seven delivery selection risk factors have the most influence on DB delivery selection: (1) scope risk; (2) third-party and complexity risk; (3) construction risk; (4) utility and right-of-way (ROW) risk; (5) level of design and contract risk; (6) management risk; and (7) regulation and railroad risk. This study compares risk preferences of public owners and design-builders for choosing DB delivery. Understanding these risk factors will help professionals not only select DB for appropriate projects but also allocate risks more properly in DB contracts.
    publisherAmerican Society of Civil Engineers
    titleImpact of Risk on Design-Build Selection for Highway Design and Construction Projects
    typeJournal Paper
    journal volume30
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000210
    treeJournal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian