YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization

    Source: Journal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 002
    Author:
    Lianying Zhang
    ,
    Jingjing Du
    ,
    Shushan Zhang
    DOI: 10.1061/(ASCE)ME.1943-5479.0000189
    Publisher: American Society of Civil Engineers
    Abstract: The importance of time-cost-quality trade-off in construction projects has been widely recognized by the construction industry. In this paper, we develop an integrated optimization model on the basis of improved time-cost and quality-time models. We improve the traditional cost-time model by taking reward and punishment into consideration. Further, we build a new quality model, called quality performance index (QPI), to describe system reliability. The avoidance of assigning the node weights and referring to expert experience adds to the practicality of the quality calculation. In the process of decision-making, we use contractual time, cost, and quality as benchmarks for evaluation of feasible solutions. Then, we combine an immune genetic algorithm with a constriction factor particle swarm optimization to get a new algorithm, called immune genetic particle swarm optimization (IGPSO). We test the effectiveness of IGPSO using two typical test functions and solve a practical example. Optimization results proved the practicability and validity of the model. We offer several Pareto solutions for a decision-maker to choose from in accordance with their expertise and project considerations.
    • Download: (809.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/66248
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorLianying Zhang
    contributor authorJingjing Du
    contributor authorShushan Zhang
    date accessioned2017-05-08T21:54:46Z
    date available2017-05-08T21:54:46Z
    date copyrightMarch 2014
    date issued2014
    identifier other%28asce%29me%2E1943-5479%2E0000225.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66248
    description abstractThe importance of time-cost-quality trade-off in construction projects has been widely recognized by the construction industry. In this paper, we develop an integrated optimization model on the basis of improved time-cost and quality-time models. We improve the traditional cost-time model by taking reward and punishment into consideration. Further, we build a new quality model, called quality performance index (QPI), to describe system reliability. The avoidance of assigning the node weights and referring to expert experience adds to the practicality of the quality calculation. In the process of decision-making, we use contractual time, cost, and quality as benchmarks for evaluation of feasible solutions. Then, we combine an immune genetic algorithm with a constriction factor particle swarm optimization to get a new algorithm, called immune genetic particle swarm optimization (IGPSO). We test the effectiveness of IGPSO using two typical test functions and solve a practical example. Optimization results proved the practicability and validity of the model. We offer several Pareto solutions for a decision-maker to choose from in accordance with their expertise and project considerations.
    publisherAmerican Society of Civil Engineers
    titleSolution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
    typeJournal Paper
    journal volume30
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000189
    treeJournal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian