YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Need for Alternative Research Approaches in Construction Management: Case of Delay Studies

    Source: Journal of Management in Engineering:;2013:;Volume ( 029 ):;issue: 004
    Author:
    Abdullah AlSehaimi
    ,
    Lauri Koskela
    ,
    Patricia Tzortzopoulos
    DOI: 10.1061/(ASCE)ME.1943-5479.0000148
    Publisher: American Society of Civil Engineers
    Abstract: Over the years, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite significant consensus, most published studies fall short of providing clear recommendations for the improvement of project management practice. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular causes of delay. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated through alternative research approaches, i.e., action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.
    • Download: (754.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Need for Alternative Research Approaches in Construction Management: Case of Delay Studies

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/66206
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAbdullah AlSehaimi
    contributor authorLauri Koskela
    contributor authorPatricia Tzortzopoulos
    date accessioned2017-05-08T21:54:40Z
    date available2017-05-08T21:54:40Z
    date copyrightOctober 2013
    date issued2013
    identifier other%28asce%29me%2E1943-5479%2E0000180.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66206
    description abstractOver the years, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite significant consensus, most published studies fall short of providing clear recommendations for the improvement of project management practice. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular causes of delay. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated through alternative research approaches, i.e., action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.
    publisherAmerican Society of Civil Engineers
    titleNeed for Alternative Research Approaches in Construction Management: Case of Delay Studies
    typeJournal Paper
    journal volume29
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000148
    treeJournal of Management in Engineering:;2013:;Volume ( 029 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian