YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Critical Concerns of Production Control System on Projects with Labor Constraints: Lessons from a Residential Case Study

    Source: Journal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 003
    Author:
    Panagiotis Mitropoulos
    ,
    Tudor Nichita
    DOI: 10.1061/(ASCE)ME.1943-5479.0000015
    Publisher: American Society of Civil Engineers
    Abstract: Labor constraints and schedule pressures are common in periods of high market growth. Such conditions can have a significant impact on project performance. However, the extent to which such conditions impact the project depends on the effectiveness of the production control system. This case study analyzes the performance problems on a large residential project with significant labor constraints. The case first describes how the combination of labor shortage, high workload, and quality problems caused extensive workflow disruptions and schedule delays. Then, the analysis discusses why the production control system (the way the work assignments are planned, coordinated, and released for execution) failed to effectively manage these problems. The case is based on data from nine single-family houses in a large residential development. To evaluate the production control system, the authors used lean construction metrics and collected detailed data on the activities completed every week, the activities that were not completed as planned for that week, and the reasons for not completion. At the completion of the units, the researchers tracked the cycle time and evaluated the effect of the production control problems on the delays. The findings illustrate that, on projects with labor constraints, it is critical that the production control system focuses on creating reliable work assignments and minimizing quality defects in order to prevent further disruptions and make the best possible utilization of the limited labor resources.
    • Download: (197.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Critical Concerns of Production Control System on Projects with Labor Constraints: Lessons from a Residential Case Study

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/66077
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorPanagiotis Mitropoulos
    contributor authorTudor Nichita
    date accessioned2017-05-08T21:54:26Z
    date available2017-05-08T21:54:26Z
    date copyrightJuly 2010
    date issued2010
    identifier other%28asce%29me%2E1943-5479%2E0000049.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66077
    description abstractLabor constraints and schedule pressures are common in periods of high market growth. Such conditions can have a significant impact on project performance. However, the extent to which such conditions impact the project depends on the effectiveness of the production control system. This case study analyzes the performance problems on a large residential project with significant labor constraints. The case first describes how the combination of labor shortage, high workload, and quality problems caused extensive workflow disruptions and schedule delays. Then, the analysis discusses why the production control system (the way the work assignments are planned, coordinated, and released for execution) failed to effectively manage these problems. The case is based on data from nine single-family houses in a large residential development. To evaluate the production control system, the authors used lean construction metrics and collected detailed data on the activities completed every week, the activities that were not completed as planned for that week, and the reasons for not completion. At the completion of the units, the researchers tracked the cycle time and evaluated the effect of the production control problems on the delays. The findings illustrate that, on projects with labor constraints, it is critical that the production control system focuses on creating reliable work assignments and minimizing quality defects in order to prevent further disruptions and make the best possible utilization of the limited labor resources.
    publisherAmerican Society of Civil Engineers
    titleCritical Concerns of Production Control System on Projects with Labor Constraints: Lessons from a Residential Case Study
    typeJournal Paper
    journal volume26
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000015
    treeJournal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian