YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders

    Source: Journal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 002
    Author:
    Jingfeng Yuan
    ,
    Miroslaw J. Skibniewski
    ,
    Qiming Li
    ,
    Lei Zheng
    DOI: 10.1061/(ASCE)ME.1943-5479.0000011
    Publisher: American Society of Civil Engineers
    Abstract: Over the years, public-private partnership (PPP) has been acknowledged by many as an innovative approach to the procurement of public projects. The desire for more efficient and effective PPP projects renders the performance management to be increasingly important, in which the influence of the stakeholders must be considered. To implement complete and effective performance management in PPP projects, 15 performance objective attributes are proposed based on the perspectives of different stakeholders. A structured questionnaire survey was conducted to investigate the relative significance of each attribute in four stakeholder groups. According to the survey results, the objective attributes are all important. Integrating all stakeholders’ benefits and selecting the appropriate qualitative level of performance objective in the process of decision making are two particularly important problems because of stakeholders’ different preferences. To resolve these problems, a fuzzy entropy method and a fuzzy TOPSIS method based on projection distance have been developed to calculate the final decision weights in all stakeholder groups and select appropriate performance objective levels for PPP projects, respectively. The final decision weights are obtained using fuzzy entropy to integrate the experiences and knowledge of all stakeholders. An illustrative case study on the Beijing National Stadium project for the 2008 Olympic Games is used to demonstrate the feasibility and practicability of the proposed model.
    • Download: (907.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/66073
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorJingfeng Yuan
    contributor authorMiroslaw J. Skibniewski
    contributor authorQiming Li
    contributor authorLei Zheng
    date accessioned2017-05-08T21:54:26Z
    date available2017-05-08T21:54:26Z
    date copyrightApril 2010
    date issued2010
    identifier other%28asce%29me%2E1943-5479%2E0000045.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66073
    description abstractOver the years, public-private partnership (PPP) has been acknowledged by many as an innovative approach to the procurement of public projects. The desire for more efficient and effective PPP projects renders the performance management to be increasingly important, in which the influence of the stakeholders must be considered. To implement complete and effective performance management in PPP projects, 15 performance objective attributes are proposed based on the perspectives of different stakeholders. A structured questionnaire survey was conducted to investigate the relative significance of each attribute in four stakeholder groups. According to the survey results, the objective attributes are all important. Integrating all stakeholders’ benefits and selecting the appropriate qualitative level of performance objective in the process of decision making are two particularly important problems because of stakeholders’ different preferences. To resolve these problems, a fuzzy entropy method and a fuzzy TOPSIS method based on projection distance have been developed to calculate the final decision weights in all stakeholder groups and select appropriate performance objective levels for PPP projects, respectively. The final decision weights are obtained using fuzzy entropy to integrate the experiences and knowledge of all stakeholders. An illustrative case study on the Beijing National Stadium project for the 2008 Olympic Games is used to demonstrate the feasibility and practicability of the proposed model.
    publisherAmerican Society of Civil Engineers
    titlePerformance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders
    typeJournal Paper
    journal volume26
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000011
    treeJournal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian