YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Concurrent Delays in Construction: International Legal Perspective

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2014:;Volume ( 006 ):;issue: 001
    Author:
    Farrukh Arif
    ,
    Ayman A. Morad
    DOI: 10.1061/(ASCE)LA.1943-4170.0000134
    Publisher: American Society of Civil Engineers
    Abstract: The term “concurrent delays” describes the situation when more than one delay occurs simultaneously, either of which would alone delay the overall project. The responsibility of concurrent delays is usually attributable to opposing parties to the contract, such as owner and contractor. This often leads to disputes concerning the extent to which each of the parties is responsible for project delay. Lack of agreement on the approach to properly apportion the damages because of concurrent delays exists throughout the various legal systems worldwide. Most of the time, judgments with respect to apportionment because of concurrent delays by courts are based upon precedents and case law owing to lack of agreed to legal practice. Realizing such need, this study overviews and compares various approaches adopted by courts with respect to ruling on concurrent delay claims and apportionment under different legal system legal systems including the United States (U.S.), Canada, United Kingdom (U.K.), and Australia. This study concludes that in general the U.S. approach in dealing with concurrent delay claims is far more mature and relatively more consistent compared with the other studied legal systems.
    • Download: (55.78Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Concurrent Delays in Construction: International Legal Perspective

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/65893
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorFarrukh Arif
    contributor authorAyman A. Morad
    date accessioned2017-05-08T21:54:09Z
    date available2017-05-08T21:54:09Z
    date copyrightFebruary 2014
    date issued2014
    identifier other%28asce%29lm%2E1943-5630%2E0000064.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/65893
    description abstractThe term “concurrent delays” describes the situation when more than one delay occurs simultaneously, either of which would alone delay the overall project. The responsibility of concurrent delays is usually attributable to opposing parties to the contract, such as owner and contractor. This often leads to disputes concerning the extent to which each of the parties is responsible for project delay. Lack of agreement on the approach to properly apportion the damages because of concurrent delays exists throughout the various legal systems worldwide. Most of the time, judgments with respect to apportionment because of concurrent delays by courts are based upon precedents and case law owing to lack of agreed to legal practice. Realizing such need, this study overviews and compares various approaches adopted by courts with respect to ruling on concurrent delay claims and apportionment under different legal system legal systems including the United States (U.S.), Canada, United Kingdom (U.K.), and Australia. This study concludes that in general the U.S. approach in dealing with concurrent delay claims is far more mature and relatively more consistent compared with the other studied legal systems.
    publisherAmerican Society of Civil Engineers
    titleConcurrent Delays in Construction: International Legal Perspective
    typeJournal Paper
    journal volume6
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000134
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2014:;Volume ( 006 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian