YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time At Large within the Common Law Legal System: Application to Standard Forms of Contract

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2014:;Volume ( 006 ):;issue: 001
    Author:
    Salwa A. Fawzy
    ,
    Islam H. El-adaway
    DOI: 10.1061/(ASCE)LA.1943-4170.0000124
    Publisher: American Society of Civil Engineers
    Abstract: Time is of extreme importance in the construction industry. The contractor has an obligation to complete the works within the time for completion. On the other hand, the employer should not impede the contractor in performing its obligations under the contract. If the contractor is prevented from completing a project by the date for completion for a reason for which the employer is responsible, and there is no right to extend time for completion or it is not properly extended, time becomes
    • Download: (125.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Time At Large within the Common Law Legal System: Application to Standard Forms of Contract

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/65883
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorSalwa A. Fawzy
    contributor authorIslam H. El-adaway
    date accessioned2017-05-08T21:54:08Z
    date available2017-05-08T21:54:08Z
    date copyrightFebruary 2014
    date issued2014
    identifier other%28asce%29lm%2E1943-5630%2E0000050.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/65883
    description abstractTime is of extreme importance in the construction industry. The contractor has an obligation to complete the works within the time for completion. On the other hand, the employer should not impede the contractor in performing its obligations under the contract. If the contractor is prevented from completing a project by the date for completion for a reason for which the employer is responsible, and there is no right to extend time for completion or it is not properly extended, time becomes
    publisherAmerican Society of Civil Engineers
    titleTime At Large within the Common Law Legal System: Application to Standard Forms of Contract
    typeJournal Paper
    journal volume6
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000124
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2014:;Volume ( 006 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian