YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimizing Transparency and Disclosure to Reduce Right-of-Way Acquisition Duration for Construction Projects in Mississippi

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2013:;Volume ( 005 ):;issue: 003
    Author:
    Imad Aleithawe
    DOI: 10.1061/(ASCE)LA.1943-4170.0000119
    Publisher: American Society of Civil Engineers
    Abstract: Any delays in the right-of-way (ROW) acquisition process can lead to major delays in the construction phase. This paper examines the factors that have contributed to higher numbers of condemnation cases and, by extension, to delays in the ROW acquisition process in Mississippi. Addressing some of the delay factors will allow targeted improvements to reduce condemnation cases and speed the acquisition process. By using a survey of practitioners and previous analyses, condemnation cases, transparency, and Mississippi’s lack of price disclosure in the public record were identified as significant factors that contributed to delays in the ROW acquisition process. The identified factors that contributed to acquisition delays at the Mississippi Department of Transportation and the survey results were used to develop a new recommended process, changing the state law to reduce the number of condemnations, increase the number of parcels acquired through negotiation, and enhance the overall efficiency of the ROW acquisition process. The recommended new process was tested and validated on an active project that contained 32 parcels in which 10 (31%) parcels were considered for condemnation. Using this new process, only one parcel (3%) was condemned and the other nine parcels (28%) were prevented from condemnation. This new process significantly reduced the duration of ROW acquisition by reducing potential condemnation cases and enhanced the negotiation and the overall acquisition process. The new process is simple and readily applicable for the acquisition policies and procedures of any transportation agency.
    • Download: (69.23Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimizing Transparency and Disclosure to Reduce Right-of-Way Acquisition Duration for Construction Projects in Mississippi

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/65878
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorImad Aleithawe
    date accessioned2017-05-08T21:54:07Z
    date available2017-05-08T21:54:07Z
    date copyrightAugust 2013
    date issued2013
    identifier other%28asce%29lm%2E1943-5630%2E0000039.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/65878
    description abstractAny delays in the right-of-way (ROW) acquisition process can lead to major delays in the construction phase. This paper examines the factors that have contributed to higher numbers of condemnation cases and, by extension, to delays in the ROW acquisition process in Mississippi. Addressing some of the delay factors will allow targeted improvements to reduce condemnation cases and speed the acquisition process. By using a survey of practitioners and previous analyses, condemnation cases, transparency, and Mississippi’s lack of price disclosure in the public record were identified as significant factors that contributed to delays in the ROW acquisition process. The identified factors that contributed to acquisition delays at the Mississippi Department of Transportation and the survey results were used to develop a new recommended process, changing the state law to reduce the number of condemnations, increase the number of parcels acquired through negotiation, and enhance the overall efficiency of the ROW acquisition process. The recommended new process was tested and validated on an active project that contained 32 parcels in which 10 (31%) parcels were considered for condemnation. Using this new process, only one parcel (3%) was condemned and the other nine parcels (28%) were prevented from condemnation. This new process significantly reduced the duration of ROW acquisition by reducing potential condemnation cases and enhanced the negotiation and the overall acquisition process. The new process is simple and readily applicable for the acquisition policies and procedures of any transportation agency.
    publisherAmerican Society of Civil Engineers
    titleOptimizing Transparency and Disclosure to Reduce Right-of-Way Acquisition Duration for Construction Projects in Mississippi
    typeJournal Paper
    journal volume5
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000119
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2013:;Volume ( 005 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian