contributor author | Jiliang Liu | |
contributor author | Zhengzhong Wang | |
contributor author | Xing Fang | |
date accessioned | 2017-05-08T21:52:47Z | |
date available | 2017-05-08T21:52:47Z | |
date copyright | November 2010 | |
date issued | 2010 | |
identifier other | %28asce%29ir%2E1943-4774%2E0000281.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/65146 | |
description abstract | This note presents iterative formulas that can be used to calculate the normal depth for all types of horseshoe cross sections. Based on the principle of gradual optimization fitting, general estimation formulas were developed for direct computation of the normal depth for all types of the standard horseshoe cross sections. The estimation formulas have high accuracy for hydraulic designers to use in comparison with the accurate normal depths determined from iterative formulas, and the maximum relative error is less than 0.5%. | |
publisher | American Society of Civil Engineers | |
title | Iterative Formulas and Estimation Formulas for Computing Normal Depth of Horseshoe Cross-Section Tunnel | |
type | Journal Paper | |
journal volume | 136 | |
journal issue | 11 | |
journal title | Journal of Irrigation and Drainage Engineering | |
identifier doi | 10.1061/(ASCE)IR.1943-4774.0000254 | |
tree | Journal of Irrigation and Drainage Engineering:;2010:;Volume ( 136 ):;issue: 011 | |
contenttype | Fulltext | |