YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimal Extension of Rain Gauge Monitoring Network for Rainfall Intensity and Erosivity Index Interpolation

    Source: Journal of Hydrologic Engineering:;2011:;Volume ( 016 ):;issue: 008
    Author:
    Afef Chebbi
    ,
    Zoubeida Kebaili Bargaoui
    ,
    Maria da Conceição Cunha
    DOI: 10.1061/(ASCE)HE.1943-5584.0000353
    Publisher: American Society of Civil Engineers
    Abstract: Rain gauge monitoring networks are highly important for precipitation and erosion estimation. In general, measurement accuracy depends on the precipitation as well as on the network size and design. This paper proposes a method for assessing the optimal location of new monitoring stations within an existing rain gauge network. It takes account of precipitation as well as the prediction accuracy of rainfall erosivity. A well known geostatistical variance-reduction method is applied jointly with simulated annealing as an algorithm for objective function minimization. With respect to the first objective, the kriging variance of intensity estimation is minimized considering a reference duration of one hour. The erosion-related objective, meanwhile, is focused on the minimization of the kriging variance of estimation of the logarithm of the erosivity factor. The spatial variability of rainfall observed during the extreme rainfall event recorded in March 1973, which was the heaviest rainfall event in the period 1973–2003, is selected as the basis for developing the geostatistical approach. Scenarios in which the size of the initial network is increased by 25, 50, and 100% are tested. Another application is shown for increasing the network to meet the minimum requirement of the World Meteorological Organization relative to the network spatial density. Optimal single objective networks are compared for both the intensity and erosivity factor objectives. With regard to the new station locations, it is found that the optimal single objective networks differ by just one or two stations. Multiobjective optimization techniques are then applied to help in the network augmentation process. If both the spatial distribution of the rainfall intensity and the spatial distribution of the erosivity index are captured, this helps with the selection of the most relevant new stations. Results are identical to examples of single objectives when equal weighting factors are adopted for both objectives for the smallest augmentation scenario (only three new stations to be implemented). Different optimal rain gauge locations are obtained if one aspect is emphasized more than the other (rainfall versus erosion and vice versa) when a greater number of new stations is to be added (50 and 100% augmentation).
    • Download: (457.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimal Extension of Rain Gauge Monitoring Network for Rainfall Intensity and Erosivity Index Interpolation

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/63228
    Collections
    • Journal of Hydrologic Engineering

    Show full item record

    contributor authorAfef Chebbi
    contributor authorZoubeida Kebaili Bargaoui
    contributor authorMaria da Conceição Cunha
    date accessioned2017-05-08T21:48:56Z
    date available2017-05-08T21:48:56Z
    date copyrightAugust 2011
    date issued2011
    identifier other%28asce%29he%2E1943-5584%2E0000375.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/63228
    description abstractRain gauge monitoring networks are highly important for precipitation and erosion estimation. In general, measurement accuracy depends on the precipitation as well as on the network size and design. This paper proposes a method for assessing the optimal location of new monitoring stations within an existing rain gauge network. It takes account of precipitation as well as the prediction accuracy of rainfall erosivity. A well known geostatistical variance-reduction method is applied jointly with simulated annealing as an algorithm for objective function minimization. With respect to the first objective, the kriging variance of intensity estimation is minimized considering a reference duration of one hour. The erosion-related objective, meanwhile, is focused on the minimization of the kriging variance of estimation of the logarithm of the erosivity factor. The spatial variability of rainfall observed during the extreme rainfall event recorded in March 1973, which was the heaviest rainfall event in the period 1973–2003, is selected as the basis for developing the geostatistical approach. Scenarios in which the size of the initial network is increased by 25, 50, and 100% are tested. Another application is shown for increasing the network to meet the minimum requirement of the World Meteorological Organization relative to the network spatial density. Optimal single objective networks are compared for both the intensity and erosivity factor objectives. With regard to the new station locations, it is found that the optimal single objective networks differ by just one or two stations. Multiobjective optimization techniques are then applied to help in the network augmentation process. If both the spatial distribution of the rainfall intensity and the spatial distribution of the erosivity index are captured, this helps with the selection of the most relevant new stations. Results are identical to examples of single objectives when equal weighting factors are adopted for both objectives for the smallest augmentation scenario (only three new stations to be implemented). Different optimal rain gauge locations are obtained if one aspect is emphasized more than the other (rainfall versus erosion and vice versa) when a greater number of new stations is to be added (50 and 100% augmentation).
    publisherAmerican Society of Civil Engineers
    titleOptimal Extension of Rain Gauge Monitoring Network for Rainfall Intensity and Erosivity Index Interpolation
    typeJournal Paper
    journal volume16
    journal issue8
    journal titleJournal of Hydrologic Engineering
    identifier doi10.1061/(ASCE)HE.1943-5584.0000353
    treeJournal of Hydrologic Engineering:;2011:;Volume ( 016 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian