YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimal Dam Operation during Flood Season Using a Distributed Hydrological Model and a Heuristic Algorithm

    Source: Journal of Hydrologic Engineering:;2010:;Volume ( 015 ):;issue: 007
    Author:
    Oliver Cristian Saavedra Valeriano
    ,
    Toshio Koike
    ,
    Kun Yang
    ,
    Dawen Yang
    DOI: 10.1061/(ASCE)HE.1943-5584.0000212
    Publisher: American Society of Civil Engineers
    Abstract: A physically based distributed hydrological model is coupled with an optimization algorithm for joint dam operation to reduce the flood peaks downstream. The decision variables are the release-inflow ratios. The heuristic algorithm seeds different release scenarios attempting to find the most suitable combination. The objective is to reduce the flood peak downstream, and the objective function is to minimize the difference between the simulated and threshold discharges. The latter depends on the purpose of flood management at the basin. Here, it is proposed as the mean discharge during heavy rainfall and is used to start a special dam operation. In order to fulfill the objective function, the reservoirs are expected to release water before the flood event takes place and close the gates during the flood peaks to replenish the released water beforehand. The developed system was applied to the upper Tone River in Japan where the optimal release schedule from two key dams was obtained. The observed weather radar products were input to the hydrological model to simulate the discharge within the river network. Then, the simulated inflows were input to the dam storage functions. The release is routed downstream and the river discharge is evaluated at the control point. The results indicate that the proposed integrated operation can effectively reduce a flood peak suggesting the feasibility of real-time operation in future developments.
    • Download: (215.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimal Dam Operation during Flood Season Using a Distributed Hydrological Model and a Heuristic Algorithm

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/63083
    Collections
    • Journal of Hydrologic Engineering

    Show full item record

    contributor authorOliver Cristian Saavedra Valeriano
    contributor authorToshio Koike
    contributor authorKun Yang
    contributor authorDawen Yang
    date accessioned2017-05-08T21:48:44Z
    date available2017-05-08T21:48:44Z
    date copyrightJuly 2010
    date issued2010
    identifier other%28asce%29he%2E1943-5584%2E0000234.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/63083
    description abstractA physically based distributed hydrological model is coupled with an optimization algorithm for joint dam operation to reduce the flood peaks downstream. The decision variables are the release-inflow ratios. The heuristic algorithm seeds different release scenarios attempting to find the most suitable combination. The objective is to reduce the flood peak downstream, and the objective function is to minimize the difference between the simulated and threshold discharges. The latter depends on the purpose of flood management at the basin. Here, it is proposed as the mean discharge during heavy rainfall and is used to start a special dam operation. In order to fulfill the objective function, the reservoirs are expected to release water before the flood event takes place and close the gates during the flood peaks to replenish the released water beforehand. The developed system was applied to the upper Tone River in Japan where the optimal release schedule from two key dams was obtained. The observed weather radar products were input to the hydrological model to simulate the discharge within the river network. Then, the simulated inflows were input to the dam storage functions. The release is routed downstream and the river discharge is evaluated at the control point. The results indicate that the proposed integrated operation can effectively reduce a flood peak suggesting the feasibility of real-time operation in future developments.
    publisherAmerican Society of Civil Engineers
    titleOptimal Dam Operation during Flood Season Using a Distributed Hydrological Model and a Heuristic Algorithm
    typeJournal Paper
    journal volume15
    journal issue7
    journal titleJournal of Hydrologic Engineering
    identifier doi10.1061/(ASCE)HE.1943-5584.0000212
    treeJournal of Hydrologic Engineering:;2010:;Volume ( 015 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian