Show simple item record

contributor authorGiha Lee
contributor authorYasuto Tachikawa
contributor authorKaoru Takara
date accessioned2017-05-08T21:48:31Z
date available2017-05-08T21:48:31Z
date copyrightOctober 2009
date issued2009
identifier other%28asce%29he%2E1943-5584%2E0000118.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/62963
description abstractSelecting an appropriate digital elevation model (DEM) resolution is an essential part of distributed rainfall-runoff modeling since the resolution affects parameter values and, in turn, leads to predictive uncertainty. Moreover, the DEM resolution directly determines the computational workload required for model simulation. This study conducted several experiments to clarify the interaction between topographic and process parameters due to the spatial resolution of DEMs in distributed rainfall-runoff modeling. First, five different spatial resolutions (from 50 m to 1 km) were used to analyze the effects of DEM resolution on the topographic and process parameters of a distributed rainfall-runoff model [kinematic wave method for subsurface and surface runoff (KWMSS)]. Second, parameter compatibility was tested with regard to the sensitivity of model performance to optimal parameter values for each DEM, by applying the best-performing parameter combinations for each resolution to the models based on differing resolutions. Finally, the sensitivity of model performances to artificially generated parameters (deviating ±10% from optimal parameter sets) was analyzed to determine whether fine spatial discretization yielded equally good model performance measures or indistinguishable hydrographs (i.e., equifinality). The results indicate that differing topographic parameters due to distinct DEM sizes require differing process parameters to produce identically good runoff simulations. In addition, the parameter compatibility assessment suggests that increased spatial complexity due to fine DEM resolution results in decreased identifiability in process parameters. Consequently, nonoptimal parameter values can yield acceptable model performance measures when modeling is based on DEM resolutions of 250 m and smaller. The results of the sensitivity analysis also indicate that fine spatial discretization can be a dominant factor causing equifinality as well as overparameterization in distributed rainfall-runoff modeling. These findings may provide a new perspective on the equifinality problem, which many consider to be caused by huge model parameter requirements when operating distributed models.
publisherAmerican Society of Civil Engineers
titleInteraction between Topographic and Process Parameters due to the Spatial Resolution of DEMs in Distributed Rainfall-Runoff Modeling
typeJournal Paper
journal volume14
journal issue10
journal titleJournal of Hydrologic Engineering
identifier doi10.1061/(ASCE)HE.1943-5584.0000098
treeJournal of Hydrologic Engineering:;2009:;Volume ( 014 ):;issue: 010
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record