YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Selecting Flow Frequency Distributions for Designing a Small Low-Head Dam Removal Cofferdam

    Source: Journal of Hydrologic Engineering:;2009:;Volume ( 014 ):;issue: 009
    Author:
    Liaqat A. Khan
    DOI: 10.1061/(ASCE)HE.1943-5584.0000073
    Publisher: American Society of Civil Engineers
    Abstract: One of the first steps in removing a dam is the construction of a cofferdam so that demolition activities can proceed safely. The time necessary for removing a small low-head dam is often on the order of a few months. To minimize the cofferdam construction cost, these dams are generally removed during the low flow months of the year. Therefore, design of cofferdams should be based on river flow series during the dam removal period, rather than the entire year. In this study, available hourly and daily average records at the recently removed Marmot Dam on the Sandy River, Oregon are analyzed for four dam removal periods, varying from 1 to 4 months (July through October).
    • Download: (1.605Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Selecting Flow Frequency Distributions for Designing a Small Low-Head Dam Removal Cofferdam

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/62957
    Collections
    • Journal of Hydrologic Engineering

    Show full item record

    contributor authorLiaqat A. Khan
    date accessioned2017-05-08T21:48:30Z
    date available2017-05-08T21:48:30Z
    date copyrightSeptember 2009
    date issued2009
    identifier other%28asce%29he%2E1943-5584%2E0000111.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/62957
    description abstractOne of the first steps in removing a dam is the construction of a cofferdam so that demolition activities can proceed safely. The time necessary for removing a small low-head dam is often on the order of a few months. To minimize the cofferdam construction cost, these dams are generally removed during the low flow months of the year. Therefore, design of cofferdams should be based on river flow series during the dam removal period, rather than the entire year. In this study, available hourly and daily average records at the recently removed Marmot Dam on the Sandy River, Oregon are analyzed for four dam removal periods, varying from 1 to 4 months (July through October).
    publisherAmerican Society of Civil Engineers
    titleSelecting Flow Frequency Distributions for Designing a Small Low-Head Dam Removal Cofferdam
    typeJournal Paper
    journal volume14
    journal issue9
    journal titleJournal of Hydrologic Engineering
    identifier doi10.1061/(ASCE)HE.1943-5584.0000073
    treeJournal of Hydrologic Engineering:;2009:;Volume ( 014 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian