Show simple item record

contributor authorTien H. Wu
contributor authorStephan M. Gale
contributor authorSteven Z. Zhou
contributor authorEugene C. Geiger
date accessioned2017-05-08T21:47:04Z
date available2017-05-08T21:47:04Z
date copyrightApril 2011
date issued2011
identifier other%28asce%29gt%2E1943-5606%2E0000454.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/62218
description abstractA geotextile-reinforced embankment was built over soft ground. Staged construction and vertical prefabricated drains were used to obtain strength gain via consolidation of the foundation material. Settlement and pore pressure were measured as a part of construction control. Settlement, differential settlement, and rate of consolidation were predicted by simple models. Uncertainties in the predictions were evaluated to assess the reliability of the predictions. The estimated errors were compared with the measured values, and major contributors to prediction errors were identified.
publisherAmerican Society of Civil Engineers
titleReliability of Settlement Prediction—Case History
typeJournal Paper
journal volume137
journal issue4
journal titleJournal of Geotechnical and Geoenvironmental Engineering
identifier doi10.1061/(ASCE)GT.1943-5606.0000438
treeJournal of Geotechnical and Geoenvironmental Engineering:;2011:;Volume ( 137 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record