YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Simulation-Based Multiagent Approach for Scheduling Modular Construction

    Source: Journal of Computing in Civil Engineering:;2014:;Volume ( 028 ):;issue: 002
    Author:
    Hosein Taghaddos
    ,
    Ulrich Hermann
    ,
    Simaan AbouRizk
    ,
    Yasser Mohamed
    DOI: 10.1061/(ASCE)CP.1943-5487.0000262
    Publisher: American Society of Civil Engineers
    Abstract: Modular construction is a common practice for building industrial plants, particularly in the oil sands region of Alberta, Canada. Each module is a project with its own activities and constraints. These modules are prefabricated offsite, at a location called the module assembly yard, and then shipped to the site. Effective scheduling of modules of an industrial plant involves developing a realistic schedule that makes best use of limited resources in the yard while satisfying the constraints and uncertainties of the entire project. Scheduling such large-scale, multiunit projects using commercial CPM-based scheduling applications (e.g., Primavera, Microsoft Project) is not effective. In previous work, we have introduced a hybrid framework, called simulation-based auction protocol (SBAP), for effective resource scheduling in large-scale projects. The present study employs the SBAP framework for effective allocation of resources (e.g., space, skilled crew) and for satisfaction of various constraints. This system pulls data from a comprehensive database, runs the simulation model behind the scenes, and generates various graphical reports to aid superintendents and project managers in pertinent project decisions. The developed system is also capable of scheduling the fast-track modular construction projects with limited data available, doing effective resource leveling, and scheduling resources (e.g., space, crew) effectively based on various shifts and calendars. The described case study in this paper demonstrates the capabilities of the developed system for planning the module assembly yards.
    • Download: (10.74Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Simulation-Based Multiagent Approach for Scheduling Modular Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/59244
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorHosein Taghaddos
    contributor authorUlrich Hermann
    contributor authorSimaan AbouRizk
    contributor authorYasser Mohamed
    date accessioned2017-05-08T21:40:47Z
    date available2017-05-08T21:40:47Z
    date copyrightMarch 2014
    date issued2014
    identifier other%28asce%29cp%2E1943-5487%2E0000270.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/59244
    description abstractModular construction is a common practice for building industrial plants, particularly in the oil sands region of Alberta, Canada. Each module is a project with its own activities and constraints. These modules are prefabricated offsite, at a location called the module assembly yard, and then shipped to the site. Effective scheduling of modules of an industrial plant involves developing a realistic schedule that makes best use of limited resources in the yard while satisfying the constraints and uncertainties of the entire project. Scheduling such large-scale, multiunit projects using commercial CPM-based scheduling applications (e.g., Primavera, Microsoft Project) is not effective. In previous work, we have introduced a hybrid framework, called simulation-based auction protocol (SBAP), for effective resource scheduling in large-scale projects. The present study employs the SBAP framework for effective allocation of resources (e.g., space, skilled crew) and for satisfaction of various constraints. This system pulls data from a comprehensive database, runs the simulation model behind the scenes, and generates various graphical reports to aid superintendents and project managers in pertinent project decisions. The developed system is also capable of scheduling the fast-track modular construction projects with limited data available, doing effective resource leveling, and scheduling resources (e.g., space, crew) effectively based on various shifts and calendars. The described case study in this paper demonstrates the capabilities of the developed system for planning the module assembly yards.
    publisherAmerican Society of Civil Engineers
    titleSimulation-Based Multiagent Approach for Scheduling Modular Construction
    typeJournal Paper
    journal volume28
    journal issue2
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000262
    treeJournal of Computing in Civil Engineering:;2014:;Volume ( 028 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian