YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Use of GIS and Topology in the Identification and Resolution of Space Conflicts

    Source: Journal of Computing in Civil Engineering:;2011:;Volume ( 025 ):;issue: 002
    Author:
    V. K. Bansal
    DOI: 10.1061/(ASCE)CP.1943-5487.0000075
    Publisher: American Society of Civil Engineers
    Abstract: Construction activities need space on the jobsite for their execution. Workers, equipment, materials, temporary facilities, and the developing structure share the limited jobsite space during the construction period. Multiple types of spaces for different purposes on various locations are required to execute various activities at different times. Hence, space planning helps provide a safe and productive environment. Planners mentally link two-dimensional (2D) drawings and execution schedules to generate dynamic multiple types of space requirements, which is a complex task. Therefore, researchers suggest the use of four-dimensional (4D) modeling and building information modeling (BIM) for space planning. Both simulate the construction process by linking the execution schedule with a three-dimensional (3D) model to visualize the construction sequence in space planning. However, both still lack features such as topography modeling and geospatial analysis, which affect space planning. In this work, 4D geographic information systems (GIS) were used for space planning that facilitates topographic modeling, different types of geospatial analyses, and database management. GIS was also used to generate multiple types of spaces corresponding to various activities. A feature attribute table (FAT) associated with each space describes when, where, and how long that space will be required on the jobsite. GIS-based area topology was implemented through a set of validation rules that define how working areas have to share the jobsite. A GIS-based methodology that enables space planning, time-space conflict identification, and conflict resolution prior to the construction was developed and implemented.
    • Download: (1.463Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Use of GIS and Topology in the Identification and Resolution of Space Conflicts

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/59043
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorV. K. Bansal
    date accessioned2017-05-08T21:40:20Z
    date available2017-05-08T21:40:20Z
    date copyrightMarch 2011
    date issued2011
    identifier other%28asce%29cp%2E1943-5487%2E0000082.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/59043
    description abstractConstruction activities need space on the jobsite for their execution. Workers, equipment, materials, temporary facilities, and the developing structure share the limited jobsite space during the construction period. Multiple types of spaces for different purposes on various locations are required to execute various activities at different times. Hence, space planning helps provide a safe and productive environment. Planners mentally link two-dimensional (2D) drawings and execution schedules to generate dynamic multiple types of space requirements, which is a complex task. Therefore, researchers suggest the use of four-dimensional (4D) modeling and building information modeling (BIM) for space planning. Both simulate the construction process by linking the execution schedule with a three-dimensional (3D) model to visualize the construction sequence in space planning. However, both still lack features such as topography modeling and geospatial analysis, which affect space planning. In this work, 4D geographic information systems (GIS) were used for space planning that facilitates topographic modeling, different types of geospatial analyses, and database management. GIS was also used to generate multiple types of spaces corresponding to various activities. A feature attribute table (FAT) associated with each space describes when, where, and how long that space will be required on the jobsite. GIS-based area topology was implemented through a set of validation rules that define how working areas have to share the jobsite. A GIS-based methodology that enables space planning, time-space conflict identification, and conflict resolution prior to the construction was developed and implemented.
    publisherAmerican Society of Civil Engineers
    titleUse of GIS and Topology in the Identification and Resolution of Space Conflicts
    typeJournal Paper
    journal volume25
    journal issue2
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000075
    treeJournal of Computing in Civil Engineering:;2011:;Volume ( 025 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian