YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Hybrid Model Incorporating Real Options with Process Centric and System Dynamics Modeling to Assess Value of Investments in Alternative Dispute Resolution Techniques

    Source: Journal of Computing in Civil Engineering:;2010:;Volume ( 024 ):;issue: 005
    Author:
    Carol Menassa
    ,
    Feniosky Peña Mora
    DOI: 10.1061/(ASCE)CP.1943-5487.0000044
    Publisher: American Society of Civil Engineers
    Abstract: Project-specific dispute resolution ladders (DRLs) are typically implemented in construction projects to resolve issues arising between the project participants. The DRL typically consists of single or multiple alternative dispute resolution (ADR) techniques to address construction issues at the three levels of escalation: conflicts; disputes; and claims. However, a DRL requires significant investments to cover the direct costs incurred in-house by the project participants or, externally, if construction specialists and lawyers are recruited to assist in the resolution. Thus, the benefits of the DRL implementation in a construction project must outweigh its costs for the implementation to be worthwhile. This paper presents a methodology to study the effect of different resolution strategies on the value of the investment in a DRL using option/real option theories from financial engineering, process centric modeling, and system dynamics methodology. Of particular interest in this paper is the integration of these research methodologies into a computer model to support the evaluation of the DRL investment in a particular construction project by taking into account the characteristics of (1) the project and (2) the different ADR techniques chosen for the DRL implementation. Finally, an example is presented to illustrate the application of the computer model in a real construction project. The results of the simulation serve two main purposes. First, the results of the simulation are used to verify the intended model behavior in terms of proper integration of the three methodologies (i.e., real options, process centric, and system dynamics) in one computer system. Second, the model application to a real construction project using actual project data illustrates the potential of the model in providing the project participants with information related to the expected number of claims and change orders resolved at each level of the DRL, the change in the expected savings during the construction phase, and finally the value of the investment from the perspective of the project owner.
    • Download: (332.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Hybrid Model Incorporating Real Options with Process Centric and System Dynamics Modeling to Assess Value of Investments in Alternative Dispute Resolution Techniques

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/59010
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorCarol Menassa
    contributor authorFeniosky Peña Mora
    date accessioned2017-05-08T21:40:17Z
    date available2017-05-08T21:40:17Z
    date copyrightSeptember 2010
    date issued2010
    identifier other%28asce%29cp%2E1943-5487%2E0000051.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/59010
    description abstractProject-specific dispute resolution ladders (DRLs) are typically implemented in construction projects to resolve issues arising between the project participants. The DRL typically consists of single or multiple alternative dispute resolution (ADR) techniques to address construction issues at the three levels of escalation: conflicts; disputes; and claims. However, a DRL requires significant investments to cover the direct costs incurred in-house by the project participants or, externally, if construction specialists and lawyers are recruited to assist in the resolution. Thus, the benefits of the DRL implementation in a construction project must outweigh its costs for the implementation to be worthwhile. This paper presents a methodology to study the effect of different resolution strategies on the value of the investment in a DRL using option/real option theories from financial engineering, process centric modeling, and system dynamics methodology. Of particular interest in this paper is the integration of these research methodologies into a computer model to support the evaluation of the DRL investment in a particular construction project by taking into account the characteristics of (1) the project and (2) the different ADR techniques chosen for the DRL implementation. Finally, an example is presented to illustrate the application of the computer model in a real construction project. The results of the simulation serve two main purposes. First, the results of the simulation are used to verify the intended model behavior in terms of proper integration of the three methodologies (i.e., real options, process centric, and system dynamics) in one computer system. Second, the model application to a real construction project using actual project data illustrates the potential of the model in providing the project participants with information related to the expected number of claims and change orders resolved at each level of the DRL, the change in the expected savings during the construction phase, and finally the value of the investment from the perspective of the project owner.
    publisherAmerican Society of Civil Engineers
    titleHybrid Model Incorporating Real Options with Process Centric and System Dynamics Modeling to Assess Value of Investments in Alternative Dispute Resolution Techniques
    typeJournal Paper
    journal volume24
    journal issue5
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000044
    treeJournal of Computing in Civil Engineering:;2010:;Volume ( 024 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian