YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Proactive Productivity Management at Job Sites: Understanding Characteristics of Assumptions Made for Construction Processes during Planning Based on Case Studies and Interviews

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 003
    Author:
    Te Gao
    ,
    Semiha Ergan
    ,
    Burcu Akinci
    ,
    James H. Garrett
    DOI: 10.1061/(ASCE)CO.1943-7862.0000816
    Publisher: American Society of Civil Engineers
    Abstract: During planning and execution of construction projects, project planners and managers make various assumptions with respect to execution of construction activities, availability of resources, suitability of construction methods, and status of preceding activities. However, not all of these assumptions are explicitly documented and verified before the construction activities start. Decisions made based on invalid assumptions can negatively impact the outcomes of construction projects, such as rework, activity delays, and extra material cost. To address the problems caused by invalid assumptions, this paper proposed to develop a formal approach to capture and represent assumptions and proactively verify assumptions to reduce the uncertainties associated with construction projects. To develop such a formal approach, an initial step is to identify characteristics of assumptions. The research team conducted two detailed case studies (i.e., a bridge rehabilitation project and a research lab renovation project) and seven interviews with construction professionals who have experience between 12 and 50 years. This paper provides a detailed discussion on the assumptions identified from case studies and interviews. The developed categorization of assumptions and the general characteristics of assumptions can serve as the foundation for a formal representation of assumptions, which helps construction professionals to proactively verify assumptions so as to avoid negative impacts of invalid assumptions on construction planning and execution.
    • Download: (836.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Proactive Productivity Management at Job Sites: Understanding Characteristics of Assumptions Made for Construction Processes during Planning Based on Case Studies and Interviews

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58973
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTe Gao
    contributor authorSemiha Ergan
    contributor authorBurcu Akinci
    contributor authorJames H. Garrett
    date accessioned2017-05-08T21:40:14Z
    date available2017-05-08T21:40:14Z
    date copyrightMarch 2014
    date issued2014
    identifier other%28asce%29cp%2E1943-5487%2E0000017.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58973
    description abstractDuring planning and execution of construction projects, project planners and managers make various assumptions with respect to execution of construction activities, availability of resources, suitability of construction methods, and status of preceding activities. However, not all of these assumptions are explicitly documented and verified before the construction activities start. Decisions made based on invalid assumptions can negatively impact the outcomes of construction projects, such as rework, activity delays, and extra material cost. To address the problems caused by invalid assumptions, this paper proposed to develop a formal approach to capture and represent assumptions and proactively verify assumptions to reduce the uncertainties associated with construction projects. To develop such a formal approach, an initial step is to identify characteristics of assumptions. The research team conducted two detailed case studies (i.e., a bridge rehabilitation project and a research lab renovation project) and seven interviews with construction professionals who have experience between 12 and 50 years. This paper provides a detailed discussion on the assumptions identified from case studies and interviews. The developed categorization of assumptions and the general characteristics of assumptions can serve as the foundation for a formal representation of assumptions, which helps construction professionals to proactively verify assumptions so as to avoid negative impacts of invalid assumptions on construction planning and execution.
    publisherAmerican Society of Civil Engineers
    titleProactive Productivity Management at Job Sites: Understanding Characteristics of Assumptions Made for Construction Processes during Planning Based on Case Studies and Interviews
    typeJournal Paper
    journal volume140
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000816
    treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian