YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 002
    Author:
    Mehrdad Arashpour
    ,
    Ron Wakefield
    ,
    Nick Blismas
    ,
    E. W. M. Lee
    DOI: 10.1061/(ASCE)CO.1943-7862.0000804
    Publisher: American Society of Civil Engineers
    Abstract: Operational performance in residential construction production systems is assessed based on measures such as average house-completion time, number of houses under construction, lead time, and customer service. These systems, however, are prone to nonuniformity and interruptions caused by a wide range of variables such as inclement weather conditions, accidents at worksites, fluctuations in demand for houses, and rework. The availability and capacity of resources therefore are not the sole measures for evaluating construction production systems capacity, especially when rework is involved. The writers’ aim is to investigate the effects of rework timeframe and frequency/length on tangible performance measures. Different call-back timeframes for rework and their impact on house-completion times are modeled and analyzed. Volume home-building was chosen as the industry sector studied in the research reported in this paper because it is a data-rich environment. The writers designed several experiments to model on time, late, and early call-back timeframes in the presence of rework with different length and frequency. Both mathematical modeling and discrete-event simulation were then used to compare and contrast outputs. The measurements showed that the average completion time is shorter in systems interrupted by frequent but short rework. In other words, a smaller downstream buffer between processes is required to avoid work starvation than those systems affected by infrequent but long interruptions. Early call-backs for rework can significantly increase the number of house completions over the long run. This indicates that there is an opportunity for the mass house-building sector to improve work practice and project delivery by effectively managing rework and its related variables. The research reported in this paper builds on the current body-of-knowledge by applying even-flow production theory to the analysis of rework in the residential construction sector, with the intention of ensuring minimal disruption to construction production process and improving productivity.
    • Download: (4.296Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58963
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMehrdad Arashpour
    contributor authorRon Wakefield
    contributor authorNick Blismas
    contributor authorE. W. M. Lee
    date accessioned2017-05-08T21:40:13Z
    date available2017-05-08T21:40:13Z
    date copyrightFebruary 2014
    date issued2014
    identifier other%28asce%29co%2E1943-7862%2E0000812.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58963
    description abstractOperational performance in residential construction production systems is assessed based on measures such as average house-completion time, number of houses under construction, lead time, and customer service. These systems, however, are prone to nonuniformity and interruptions caused by a wide range of variables such as inclement weather conditions, accidents at worksites, fluctuations in demand for houses, and rework. The availability and capacity of resources therefore are not the sole measures for evaluating construction production systems capacity, especially when rework is involved. The writers’ aim is to investigate the effects of rework timeframe and frequency/length on tangible performance measures. Different call-back timeframes for rework and their impact on house-completion times are modeled and analyzed. Volume home-building was chosen as the industry sector studied in the research reported in this paper because it is a data-rich environment. The writers designed several experiments to model on time, late, and early call-back timeframes in the presence of rework with different length and frequency. Both mathematical modeling and discrete-event simulation were then used to compare and contrast outputs. The measurements showed that the average completion time is shorter in systems interrupted by frequent but short rework. In other words, a smaller downstream buffer between processes is required to avoid work starvation than those systems affected by infrequent but long interruptions. Early call-backs for rework can significantly increase the number of house completions over the long run. This indicates that there is an opportunity for the mass house-building sector to improve work practice and project delivery by effectively managing rework and its related variables. The research reported in this paper builds on the current body-of-knowledge by applying even-flow production theory to the analysis of rework in the residential construction sector, with the intention of ensuring minimal disruption to construction production process and improving productivity.
    publisherAmerican Society of Civil Engineers
    titleAnalysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects
    typeJournal Paper
    journal volume140
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000804
    treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian