YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Method to Implement Delayed Product Differentiation in Construction of High-Rise Apartment Building Projects

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 010
    Author:
    Cecília Gravina da Rocha
    ,
    Sergio Luiz Kemmer
    DOI: 10.1061/(ASCE)CO.1943-7862.0000758
    Publisher: American Society of Civil Engineers
    Abstract: The customization of apartments can add value and increase clients’ satisfaction. However, companies offering such a strategy often face problems in managing the construction process. Delayed product differentiation—postponing the tasks that customize a product as much as possible—is a principle applied in manufacturing that enables companies to better cope with customization. Yet, it has not been widely explored in the building industry. This paper proposes a method to implement this principle in the construction of high-rise apartment building projects using the line-of-balance technique. First, the method is described, followed by its application in a project developed by a construction company. A comparison between the long-term plan devised using the proposed method and the initial plan shows a postponement of the decoupling point (namely, the first task that customizes an apartment) of approximately 42 weeks. At the end, the potential benefits and difficulties in creating such postponement and adopting the proposed method are discussed.
    • Download: (857.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Method to Implement Delayed Product Differentiation in Construction of High-Rise Apartment Building Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58916
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorCecília Gravina da Rocha
    contributor authorSergio Luiz Kemmer
    date accessioned2017-05-08T21:40:07Z
    date available2017-05-08T21:40:07Z
    date copyrightOctober 2013
    date issued2013
    identifier other%28asce%29co%2E1943-7862%2E0000765.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58916
    description abstractThe customization of apartments can add value and increase clients’ satisfaction. However, companies offering such a strategy often face problems in managing the construction process. Delayed product differentiation—postponing the tasks that customize a product as much as possible—is a principle applied in manufacturing that enables companies to better cope with customization. Yet, it has not been widely explored in the building industry. This paper proposes a method to implement this principle in the construction of high-rise apartment building projects using the line-of-balance technique. First, the method is described, followed by its application in a project developed by a construction company. A comparison between the long-term plan devised using the proposed method and the initial plan shows a postponement of the decoupling point (namely, the first task that customizes an apartment) of approximately 42 weeks. At the end, the potential benefits and difficulties in creating such postponement and adopting the proposed method are discussed.
    publisherAmerican Society of Civil Engineers
    titleMethod to Implement Delayed Product Differentiation in Construction of High-Rise Apartment Building Projects
    typeJournal Paper
    journal volume139
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000758
    treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian