YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Application of Time Buffers to Construction Project Task Durations

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 010
    Author:
    Marion M. Russell
    ,
    Gregory Howell
    ,
    Simon M. Hsiang
    ,
    Min Liu
    DOI: 10.1061/(ASCE)CO.1943-7862.0000735
    Publisher: American Society of Civil Engineers
    Abstract: For this research, a time buffer is defined as the extra time added during planning to individual task durations to compensate for uncertainty and protect against workflow variation to assure a predictable hand-off to subsequent crews. Although previous research has acknowledged this addition of time buffers, their use in practice has not been studied. This paper reports on what causes people to add and size time buffers. A nationwide survey was administered to project managers, superintendents, and foremen to identify the most frequent and severe reasons for adding time buffers to construction task durations. Forty-seven buffer factors were grouped into nine categories: project characteristics, prerequisite work, detailed design/working method, labor force, tools and equipment, material and components, work/jobsite conditions, management/supervision/information flow, and weather. Contributions to the body of knowledge include (1) identifying the 12 most frequent and severe causes of time buffer; (2) analyzing (understanding) how buffers are viewed differently by foremen, superintendents, and project managers, between trades and between general contractors and subcontractors, and the perception among different levels of experience; and (3) investigating how companies that do not regularly use the Last Planner System and those that do view those factors differently. Additionally, the research quantitatively developed risk profiles of the buffer factors through an integrated risk assessment approach. Understanding the application of time buffers and their associated frequency and severity will help construction managers address potential problem areas and inefficiencies in a prioritized manner.
    • Download: (485.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Application of Time Buffers to Construction Project Task Durations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58892
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMarion M. Russell
    contributor authorGregory Howell
    contributor authorSimon M. Hsiang
    contributor authorMin Liu
    date accessioned2017-05-08T21:40:02Z
    date available2017-05-08T21:40:02Z
    date copyrightOctober 2013
    date issued2013
    identifier other%28asce%29co%2E1943-7862%2E0000742.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58892
    description abstractFor this research, a time buffer is defined as the extra time added during planning to individual task durations to compensate for uncertainty and protect against workflow variation to assure a predictable hand-off to subsequent crews. Although previous research has acknowledged this addition of time buffers, their use in practice has not been studied. This paper reports on what causes people to add and size time buffers. A nationwide survey was administered to project managers, superintendents, and foremen to identify the most frequent and severe reasons for adding time buffers to construction task durations. Forty-seven buffer factors were grouped into nine categories: project characteristics, prerequisite work, detailed design/working method, labor force, tools and equipment, material and components, work/jobsite conditions, management/supervision/information flow, and weather. Contributions to the body of knowledge include (1) identifying the 12 most frequent and severe causes of time buffer; (2) analyzing (understanding) how buffers are viewed differently by foremen, superintendents, and project managers, between trades and between general contractors and subcontractors, and the perception among different levels of experience; and (3) investigating how companies that do not regularly use the Last Planner System and those that do view those factors differently. Additionally, the research quantitatively developed risk profiles of the buffer factors through an integrated risk assessment approach. Understanding the application of time buffers and their associated frequency and severity will help construction managers address potential problem areas and inefficiencies in a prioritized manner.
    publisherAmerican Society of Civil Engineers
    titleApplication of Time Buffers to Construction Project Task Durations
    typeJournal Paper
    journal volume139
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000735
    treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian