YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Decision Support System–Enhanced Scheduling in Matrix Organizations Using the Analytic Hierarchy Process

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 011
    Author:
    James D. Goedert
    ,
    Videgla D. Sekpe
    DOI: 10.1061/(ASCE)CO.1943-7862.0000734
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents a conceptual approach to scheduling multiple projects in a matrix organization with rapidly changing and sometimes competing objectives using the analytical hierarchy process (AHP) within a decision support system (DSS). This approach increased the analytical capabilities and scheduling efficacy of traditional scheduling processes in a medium-sized electric utility company. The purpose of this paper is to establish a logical framework for scheduling multiple projects with competing priorities while taking into account all known corporate organizational constraints. Traditional scheduling techniques such as the program evaluation and review technique and critical-path method are heavily based on time constraints and resource availability, neglecting factors such as customer satisfaction, organizational financial objectives, political risks, and other intangible parameters that greatly influence scheduling processes. The primary contribution of this paper is a conceptual framework that offers a platform to incorporate tangible and intangible variables into a decision support system using AHP for scheduling multiple projects with competing objectives in matrix organizations. The results of the application showed that, when compared with traditional scheduling methods, this DSS model with integrated AHP showed improvements in prioritizing in accordance with political risks, cash-flow demands, and crew allocation. It appears to be a superior solution for solving prioritization issues in matrix organizations.
    • Download: (397.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Decision Support System–Enhanced Scheduling in Matrix Organizations Using the Analytic Hierarchy Process

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58891
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJames D. Goedert
    contributor authorVidegla D. Sekpe
    date accessioned2017-05-08T21:40:02Z
    date available2017-05-08T21:40:02Z
    date copyrightNovember 2013
    date issued2013
    identifier other%28asce%29co%2E1943-7862%2E0000741.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58891
    description abstractThis paper presents a conceptual approach to scheduling multiple projects in a matrix organization with rapidly changing and sometimes competing objectives using the analytical hierarchy process (AHP) within a decision support system (DSS). This approach increased the analytical capabilities and scheduling efficacy of traditional scheduling processes in a medium-sized electric utility company. The purpose of this paper is to establish a logical framework for scheduling multiple projects with competing priorities while taking into account all known corporate organizational constraints. Traditional scheduling techniques such as the program evaluation and review technique and critical-path method are heavily based on time constraints and resource availability, neglecting factors such as customer satisfaction, organizational financial objectives, political risks, and other intangible parameters that greatly influence scheduling processes. The primary contribution of this paper is a conceptual framework that offers a platform to incorporate tangible and intangible variables into a decision support system using AHP for scheduling multiple projects with competing objectives in matrix organizations. The results of the application showed that, when compared with traditional scheduling methods, this DSS model with integrated AHP showed improvements in prioritizing in accordance with political risks, cash-flow demands, and crew allocation. It appears to be a superior solution for solving prioritization issues in matrix organizations.
    publisherAmerican Society of Civil Engineers
    titleDecision Support System–Enhanced Scheduling in Matrix Organizations Using the Analytic Hierarchy Process
    typeJournal Paper
    journal volume139
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000734
    treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian