YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Multiresource Leveling in Line-of-Balance Scheduling

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 009
    Author:
    Atilla Damci
    ,
    David Arditi
    ,
    Gul Polat
    DOI: 10.1061/(ASCE)CO.1943-7862.0000716
    Publisher: American Society of Civil Engineers
    Abstract: Line-of-balance (LOB) methodology produces a work schedule in which resource allocation is automatically performed to provide a continuous and uninterrupted use of resources, but the distribution of resources could be further improved by resource leveling even if multiple resources are involved. The objective of this study is to develop a genetic algorithm (GA)-based multiresource leveling model for schedules that are established by LOB. The proposed model postulates that the production rate and duration of an activity are governed by the resource that requires the longest duration in completing a unit. Once the LOB schedule is established, resource leveling is performed according to the principle of
    • Download: (178.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Multiresource Leveling in Line-of-Balance Scheduling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58873
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAtilla Damci
    contributor authorDavid Arditi
    contributor authorGul Polat
    date accessioned2017-05-08T21:40:00Z
    date available2017-05-08T21:40:00Z
    date copyrightSeptember 2013
    date issued2013
    identifier other%28asce%29co%2E1943-7862%2E0000723.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58873
    description abstractLine-of-balance (LOB) methodology produces a work schedule in which resource allocation is automatically performed to provide a continuous and uninterrupted use of resources, but the distribution of resources could be further improved by resource leveling even if multiple resources are involved. The objective of this study is to develop a genetic algorithm (GA)-based multiresource leveling model for schedules that are established by LOB. The proposed model postulates that the production rate and duration of an activity are governed by the resource that requires the longest duration in completing a unit. Once the LOB schedule is established, resource leveling is performed according to the principle of
    publisherAmerican Society of Civil Engineers
    titleMultiresource Leveling in Line-of-Balance Scheduling
    typeJournal Paper
    journal volume139
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000716
    treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian