YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Factors That Affect Transaction Costs in Construction Projects

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 001
    Author:
    Huimin Li
    ,
    David Arditi
    ,
    Zhuofu Wang
    DOI: 10.1061/(ASCE)CO.1943-7862.0000573
    Publisher: American Society of Civil Engineers
    Abstract: The actual cost of a construction project is comprised of not only production costs, but also transaction costs. Transaction costs include but are not limited to the costs of preparing the bidding package, estimating, drawing up a contract, administering the contract, and dealing with any deviations from contract conditions. Transaction costs constitute an important part of the construction owner’s budget. However, understanding transaction costs is difficult because of the inconsistency and ambiguity in defining transaction costs in the literature. The objective of this paper is to identify methods to minimize the transaction costs borne by the construction owner. A structural equation model is tested on data collected by means of a survey administered to construction owners. The findings indicate that the transaction costs borne by the owner can be minimized if the owner minimizes the uncertainties inherent in the transaction environment by (1) ensuring the engineering design is as complete as possible before bids are sought from contractors, (2) exploring the possibility of adopting integrated project delivery methods that would allow the owner to engage the services of a contractor early in the design phase, (3) agreeing to share some of the risks with the contractors, (4) understanding well the behavior of contractors, and (5) paying close attention to project management efficiency.
    • Download: (281.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Factors That Affect Transaction Costs in Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58741
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHuimin Li
    contributor authorDavid Arditi
    contributor authorZhuofu Wang
    date accessioned2017-05-08T21:39:50Z
    date available2017-05-08T21:39:50Z
    date copyrightJanuary 2013
    date issued2013
    identifier other%28asce%29co%2E1943-7862%2E0000581.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58741
    description abstractThe actual cost of a construction project is comprised of not only production costs, but also transaction costs. Transaction costs include but are not limited to the costs of preparing the bidding package, estimating, drawing up a contract, administering the contract, and dealing with any deviations from contract conditions. Transaction costs constitute an important part of the construction owner’s budget. However, understanding transaction costs is difficult because of the inconsistency and ambiguity in defining transaction costs in the literature. The objective of this paper is to identify methods to minimize the transaction costs borne by the construction owner. A structural equation model is tested on data collected by means of a survey administered to construction owners. The findings indicate that the transaction costs borne by the owner can be minimized if the owner minimizes the uncertainties inherent in the transaction environment by (1) ensuring the engineering design is as complete as possible before bids are sought from contractors, (2) exploring the possibility of adopting integrated project delivery methods that would allow the owner to engage the services of a contractor early in the design phase, (3) agreeing to share some of the risks with the contractors, (4) understanding well the behavior of contractors, and (5) paying close attention to project management efficiency.
    publisherAmerican Society of Civil Engineers
    titleFactors That Affect Transaction Costs in Construction Projects
    typeJournal Paper
    journal volume139
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000573
    treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian