YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Using Grouting of Shield Tunneling to Reduce Settlements of Overlying Tunnels: Case Study in Shenzhen Metro Construction

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 004
    Author:
    Xinggao Li
    ,
    Xiangsheng Chen
    DOI: 10.1061/(ASCE)CO.1943-7862.0000455
    Publisher: American Society of Civil Engineers
    Abstract: Grouting control of shield tunneling is of paramount importance to reduce settlements of existing tunnels below-passed by shield tunneling along a curved alignment and in crowded urban areas. The methodology and scheme of the grouting control of shield tunneling is illustrated taking the first Earth Pressure Balanced (EPB) shield below-crossing existing interval tunnels from Kexueguan station to Dajuyuan station of the Shenzhen metro line No. 1, for example. A combination methodology of the “observational method” and the “predefined design method” was set up to deal with parameters concerning the grouting control of shield tunneling. Some parameters of the grouting control were predefined or suggested before the below-crossing, and other parameters might be adjusted during construction on the basis of the “observational method.” The scheme primarily consists of preparation work before the below-crossing, automatic motoring system used in operation tunnels, simultaneous backfilling grouting and grouting directly through segment holes. For the simultaneous backfilling grouting, enough grouting was filled in the tail void with shield advance. With the help of automatic motoring system, the grouting directly through segment holes was employed in light of the measured settlements of existing tunnels. The maximum of the final measured settlements of existing tunnels is about 70% of the predefined allowable settlement of 20 mm, which shows that the grouting control of shield tunneling is effective in reducing settlements of existing tunnels. The grouting practice can be used as references in similar conditions.
    • Download: (5.942Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Using Grouting of Shield Tunneling to Reduce Settlements of Overlying Tunnels: Case Study in Shenzhen Metro Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58617
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorXinggao Li
    contributor authorXiangsheng Chen
    date accessioned2017-05-08T21:39:36Z
    date available2017-05-08T21:39:36Z
    date copyrightApril 2012
    date issued2012
    identifier other%28asce%29co%2E1943-7862%2E0000462.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58617
    description abstractGrouting control of shield tunneling is of paramount importance to reduce settlements of existing tunnels below-passed by shield tunneling along a curved alignment and in crowded urban areas. The methodology and scheme of the grouting control of shield tunneling is illustrated taking the first Earth Pressure Balanced (EPB) shield below-crossing existing interval tunnels from Kexueguan station to Dajuyuan station of the Shenzhen metro line No. 1, for example. A combination methodology of the “observational method” and the “predefined design method” was set up to deal with parameters concerning the grouting control of shield tunneling. Some parameters of the grouting control were predefined or suggested before the below-crossing, and other parameters might be adjusted during construction on the basis of the “observational method.” The scheme primarily consists of preparation work before the below-crossing, automatic motoring system used in operation tunnels, simultaneous backfilling grouting and grouting directly through segment holes. For the simultaneous backfilling grouting, enough grouting was filled in the tail void with shield advance. With the help of automatic motoring system, the grouting directly through segment holes was employed in light of the measured settlements of existing tunnels. The maximum of the final measured settlements of existing tunnels is about 70% of the predefined allowable settlement of 20 mm, which shows that the grouting control of shield tunneling is effective in reducing settlements of existing tunnels. The grouting practice can be used as references in similar conditions.
    publisherAmerican Society of Civil Engineers
    titleUsing Grouting of Shield Tunneling to Reduce Settlements of Overlying Tunnels: Case Study in Shenzhen Metro Construction
    typeJournal Paper
    journal volume138
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000455
    treeJournal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian