| description abstract | A key element in moving a highway construction project forward is the ability to acquire the right-of-way (ROW) in a timely manner. Delay in the acquisition process can lead to major delays to the construction phase. Identifying the delay factors will allow for a better acquisition management process. Thirty-five projects, with 1,478 parcels, acquired by the Mississippi Department of Transportation (MDOT) were randomly selected for analysis to determine the factors affecting acquisition duration. The data were analyzed using Statistica7 software with | |
| publisher | American Society of Civil Engineers | |
| title | Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects | |
| type | Journal Paper | |
| journal volume | 138 | |
| journal issue | 4 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)CO.1943-7862.0000450 | |
| tree | Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 004 | |
| contenttype | Fulltext | |