YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 004
    Author:
    Imad Aleithawe
    ,
    R. Ralph Sinno
    ,
    William H. McAnally
    DOI: 10.1061/(ASCE)CO.1943-7862.0000450
    Publisher: American Society of Civil Engineers
    Abstract: A key element in moving a highway construction project forward is the ability to acquire the right-of-way (ROW) in a timely manner. Delay in the acquisition process can lead to major delays to the construction phase. Identifying the delay factors will allow for a better acquisition management process. Thirty-five projects, with 1,478 parcels, acquired by the Mississippi Department of Transportation (MDOT) were randomly selected for analysis to determine the factors affecting acquisition duration. The data were analyzed using Statistica7 software with
    • Download: (106.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58612
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorImad Aleithawe
    contributor authorR. Ralph Sinno
    contributor authorWilliam H. McAnally
    date accessioned2017-05-08T21:39:35Z
    date available2017-05-08T21:39:35Z
    date copyrightApril 2012
    date issued2012
    identifier other%28asce%29co%2E1943-7862%2E0000456.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58612
    description abstractA key element in moving a highway construction project forward is the ability to acquire the right-of-way (ROW) in a timely manner. Delay in the acquisition process can lead to major delays to the construction phase. Identifying the delay factors will allow for a better acquisition management process. Thirty-five projects, with 1,478 parcels, acquired by the Mississippi Department of Transportation (MDOT) were randomly selected for analysis to determine the factors affecting acquisition duration. The data were analyzed using Statistica7 software with
    publisherAmerican Society of Civil Engineers
    titleRight-of-Way Acquisition Duration Prediction Model for Highway Construction Projects
    typeJournal Paper
    journal volume138
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000450
    treeJournal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian