YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Daily Work Reports–Based Production Rate Estimation for Highway Projects

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 004
    Author:
    Asregedew Woldesenbet
    ,
    “David” Hyung Seok Jeong
    ,
    Garold D. Oberlender
    DOI: 10.1061/(ASCE)CO.1943-7862.0000442
    Publisher: American Society of Civil Engineers
    Abstract: Production rate estimation of major construction activities in a project play an important role in the planning of resources, tracking project progress, and determining contract time of construction projects as these activities typically fall in the critical path of the project schedule. This paper discusses the possiblity that readily available data from highway agencies such as Daily Work Reports (DWRs), soil data, average traffic information, and weather information can be successfully used to identify and assess significant factors that must be considered in estimating the production rates of major highway activities and to develop production rate estimation models. Common production rate estimation methods such as expert opinion, engineering judgment, and production rate charts may lead to erratic production rate estimation by comparing the production rates calculated and estimated through different methods. Actual project data–based production rate estimation might be the most reliable method. An Excel-based software program was developed in this study for estimating the production rates of controlling highway construction activities when project information is given as input data.
    • Download: (581.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Daily Work Reports–Based Production Rate Estimation for Highway Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58604
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAsregedew Woldesenbet
    contributor author“David” Hyung Seok Jeong
    contributor authorGarold D. Oberlender
    date accessioned2017-05-08T21:39:35Z
    date available2017-05-08T21:39:35Z
    date copyrightApril 2012
    date issued2012
    identifier other%28asce%29co%2E1943-7862%2E0000449.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58604
    description abstractProduction rate estimation of major construction activities in a project play an important role in the planning of resources, tracking project progress, and determining contract time of construction projects as these activities typically fall in the critical path of the project schedule. This paper discusses the possiblity that readily available data from highway agencies such as Daily Work Reports (DWRs), soil data, average traffic information, and weather information can be successfully used to identify and assess significant factors that must be considered in estimating the production rates of major highway activities and to develop production rate estimation models. Common production rate estimation methods such as expert opinion, engineering judgment, and production rate charts may lead to erratic production rate estimation by comparing the production rates calculated and estimated through different methods. Actual project data–based production rate estimation might be the most reliable method. An Excel-based software program was developed in this study for estimating the production rates of controlling highway construction activities when project information is given as input data.
    publisherAmerican Society of Civil Engineers
    titleDaily Work Reports–Based Production Rate Estimation for Highway Projects
    typeJournal Paper
    journal volume138
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000442
    treeJournal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian