YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Dynamics of Rework in Complex Offshore Hydrocarbon Projects

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 012
    Author:
    Peter E. D. Love
    ,
    David J. Edwards
    ,
    Zahir Irani
    ,
    Yang M. Goh
    DOI: 10.1061/(ASCE)CO.1943-7862.0000377
    Publisher: American Society of Civil Engineers
    Abstract: Little systematic knowledge is available on the dynamics of rework in complex hydrocarbon (oil and gas) projects, despite the fact that they frequently exceed budget and schedule projections by more than 10%. To better understand pertinent issues associated with rework, twenty three in-depth interviews were undertaken with personnel from a major international oil and gas operator. The interviews sought to elicit deep individualistic knowledge about the dynamics of design changes, errors, and omissions that contributed to rework in four off-shore projects that they were involved with. Akin to previous research, the factors of poorly defined scope, unrealistic schedules, design changes, and coordination problems were identified as contributors to rework. A significant difference from previous studies, however, was that rework was expected and considered a norm. The issue at hand therefore related to ‘when and where’ rework would materialize, because it was considered that the implementation of front end loading, audits, and reviews would capture any design flaws that may have materialized. The potential revenue that could be generated from earlier extraction and production of oil and gas outweighed any rework costs that were likely to be incurred. A systemic model representing the underlying conditions that contributed to rework was developed from the findings to provide managers with the necessary insights about the interdependencies and behavior between key variables. The developed model can be used to identify future areas in which rework prevention and mitigation strategies should focus on in future projects.
    • Download: (908.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Dynamics of Rework in Complex Offshore Hydrocarbon Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58536
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPeter E. D. Love
    contributor authorDavid J. Edwards
    contributor authorZahir Irani
    contributor authorYang M. Goh
    date accessioned2017-05-08T21:39:29Z
    date available2017-05-08T21:39:29Z
    date copyrightDecember 2011
    date issued2011
    identifier other%28asce%29co%2E1943-7862%2E0000383.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58536
    description abstractLittle systematic knowledge is available on the dynamics of rework in complex hydrocarbon (oil and gas) projects, despite the fact that they frequently exceed budget and schedule projections by more than 10%. To better understand pertinent issues associated with rework, twenty three in-depth interviews were undertaken with personnel from a major international oil and gas operator. The interviews sought to elicit deep individualistic knowledge about the dynamics of design changes, errors, and omissions that contributed to rework in four off-shore projects that they were involved with. Akin to previous research, the factors of poorly defined scope, unrealistic schedules, design changes, and coordination problems were identified as contributors to rework. A significant difference from previous studies, however, was that rework was expected and considered a norm. The issue at hand therefore related to ‘when and where’ rework would materialize, because it was considered that the implementation of front end loading, audits, and reviews would capture any design flaws that may have materialized. The potential revenue that could be generated from earlier extraction and production of oil and gas outweighed any rework costs that were likely to be incurred. A systemic model representing the underlying conditions that contributed to rework was developed from the findings to provide managers with the necessary insights about the interdependencies and behavior between key variables. The developed model can be used to identify future areas in which rework prevention and mitigation strategies should focus on in future projects.
    publisherAmerican Society of Civil Engineers
    titleDynamics of Rework in Complex Offshore Hydrocarbon Projects
    typeJournal Paper
    journal volume137
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000377
    treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian