Energy Management Reduces Great Pyramid Build Effort by More Than 98%Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 012Author:Gerard C. A. Fonte
DOI: 10.1061/(ASCE)CO.1943-7862.0000373Publisher: American Society of Civil Engineers
Abstract: The general consensus of most archaeologists is that approximately 25,000 workers labored for 23 years to build the Great Pyramid in Egypt at Giza. However, by examining the “mysterious tools” and other clues left behind , it is found that the Egyptians were masters of energy management and that the 25,000-worker build time could be reduced to only 138.6 days (using very conservative calculations). More realistically, and matching evidence found at the pyramid site, approximately 4,000 workers were probably used, and they took 4–6 calendar years at a fairly leisurely pace. This is on the basis of archaeological evidence, standard engineering principles, and ingenuity. Management of energy of assembly is a critical issue in the efficient construction of large structures. The principles used in ancient times are still applicable today. It is assumed that the Egyptians were smart people and that they were capable of employing the technology that they are known to have possessed in a creative and resourceful manner.
|
Show full item record
| contributor author | Gerard C. A. Fonte | |
| date accessioned | 2017-05-08T21:39:27Z | |
| date available | 2017-05-08T21:39:27Z | |
| date copyright | December 2011 | |
| date issued | 2011 | |
| identifier other | %28asce%29co%2E1943-7862%2E0000380.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/58533 | |
| description abstract | The general consensus of most archaeologists is that approximately 25,000 workers labored for 23 years to build the Great Pyramid in Egypt at Giza. However, by examining the “mysterious tools” and other clues left behind , it is found that the Egyptians were masters of energy management and that the 25,000-worker build time could be reduced to only 138.6 days (using very conservative calculations). More realistically, and matching evidence found at the pyramid site, approximately 4,000 workers were probably used, and they took 4–6 calendar years at a fairly leisurely pace. This is on the basis of archaeological evidence, standard engineering principles, and ingenuity. Management of energy of assembly is a critical issue in the efficient construction of large structures. The principles used in ancient times are still applicable today. It is assumed that the Egyptians were smart people and that they were capable of employing the technology that they are known to have possessed in a creative and resourceful manner. | |
| publisher | American Society of Civil Engineers | |
| title | Energy Management Reduces Great Pyramid Build Effort by More Than 98% | |
| type | Journal Paper | |
| journal volume | 137 | |
| journal issue | 12 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)CO.1943-7862.0000373 | |
| tree | Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 012 | |
| contenttype | Fulltext |