YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Differences in Perspectives regarding Labor Productivity between Spanish- and English-Speaking Craft Workers

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 009
    Author:
    Jiukun Dai
    ,
    Paul M. Goodrum
    DOI: 10.1061/(ASCE)CO.1943-7862.0000329
    Publisher: American Society of Civil Engineers
    Abstract: The influx of Hispanic workers helped the U.S. construction industry alleviate its shortage of craft workers in the last decade. In 2009, Hispanics accounted for nearly a quarter (22.5%) of the construction workforce in the United States. However, no research has been conducted to examine how various factors influence Hispanic craft workers’ productivity. This paper analyzes the data from a nationwide survey to obtain craft workers’ perspective on construction productivity. The respondents were categorized as Spanish- or English-speaking workers according to their declared primary language, irrespective of their ethnic background. The findings reveal that Spanish- and English-speaking craft workers generally agreed on the priority of the factors affecting labor productivity. However, Spanish-speaking workers rated factors associated with supervisor direction, safety, and labor more severely than English-speaking craft workers. Meanwhile, English-speaking craft workers perceived factors related to engineering drawing management as being more detrimental to productivity than did Spanish-speaking craft workers. Specifically, in comparison with English-speaking craft workers, Spanish-speaking craft workers experienced more severe issues with communicating with their supervisors, pay and monetary bonus for good performance, and lack of training on safety, health, and skills. These findings should be valuable for project management to effectively improve labor productivity of their Spanish-speaking craft workforce.
    • Download: (508.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Differences in Perspectives regarding Labor Productivity between Spanish- and English-Speaking Craft Workers

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58487
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJiukun Dai
    contributor authorPaul M. Goodrum
    date accessioned2017-05-08T21:39:22Z
    date available2017-05-08T21:39:22Z
    date copyrightSeptember 2011
    date issued2011
    identifier other%28asce%29co%2E1943-7862%2E0000335.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58487
    description abstractThe influx of Hispanic workers helped the U.S. construction industry alleviate its shortage of craft workers in the last decade. In 2009, Hispanics accounted for nearly a quarter (22.5%) of the construction workforce in the United States. However, no research has been conducted to examine how various factors influence Hispanic craft workers’ productivity. This paper analyzes the data from a nationwide survey to obtain craft workers’ perspective on construction productivity. The respondents were categorized as Spanish- or English-speaking workers according to their declared primary language, irrespective of their ethnic background. The findings reveal that Spanish- and English-speaking craft workers generally agreed on the priority of the factors affecting labor productivity. However, Spanish-speaking workers rated factors associated with supervisor direction, safety, and labor more severely than English-speaking craft workers. Meanwhile, English-speaking craft workers perceived factors related to engineering drawing management as being more detrimental to productivity than did Spanish-speaking craft workers. Specifically, in comparison with English-speaking craft workers, Spanish-speaking craft workers experienced more severe issues with communicating with their supervisors, pay and monetary bonus for good performance, and lack of training on safety, health, and skills. These findings should be valuable for project management to effectively improve labor productivity of their Spanish-speaking craft workforce.
    publisherAmerican Society of Civil Engineers
    titleDifferences in Perspectives regarding Labor Productivity between Spanish- and English-Speaking Craft Workers
    typeJournal Paper
    journal volume137
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000329
    treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian