YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 006
    Author:
    Mohamed M. G. Elbarkouky
    ,
    Aminah Robinson Fayek
    DOI: 10.1061/(ASCE)CO.1943-7862.0000310
    Publisher: American Society of Civil Engineers
    Abstract: A fuzzy similarity consensus (FSC) model is presented for alignment of construction project owner and contractor project teams to their roles and responsibilities, identifying and reducing fundamental problems of conflicts, duplication, and gaps in roles and responsibilities as early as the project initiation stage. The model achieves its objective by incorporating consensus and quality of construction project teams in aggregating their opinions to decide on the party responsible for every standard task of a construction project. The roles and responsibilities of the owner and contractors are described to different extents using seven linguistic terms defined by triangular membership functions and constructed using a three-step Delphi approach, which allows experts to develop common understanding of the meaning of the terms by determining their overlap on a fuzzy linguistic scale. A modified similarity aggregation method (SAM) aggregates experts’ opinions in a linguistic framework using a consensus weight factor for each expert that is based on the similarity of his or her opinion relative to the other experts to ensure that the experts’ final decision is a result of common agreement. A fuzzy expert system (FES) determines an importance weight factor, representing expert quality for each expert; opinions are aggregated using this factor and the consensus weight factor. The FSC model contributes to the construction industry by solving a fundamental problem for project owners who want to identify and reduce potential conflicts between their project teams on the extent of their roles and responsibilities prior to the construction stage. Also, the FSC model provides an improvement over previous consensus-based approaches, which rely on a subjective assessment of experts’ important weights in aggregating their opinions, and it modifies the SAM to adapt it to a linguistic environment.
    • Download: (238.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58467
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohamed M. G. Elbarkouky
    contributor authorAminah Robinson Fayek
    date accessioned2017-05-08T21:39:20Z
    date available2017-05-08T21:39:20Z
    date copyrightJune 2011
    date issued2011
    identifier other%28asce%29co%2E1943-7862%2E0000316.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58467
    description abstractA fuzzy similarity consensus (FSC) model is presented for alignment of construction project owner and contractor project teams to their roles and responsibilities, identifying and reducing fundamental problems of conflicts, duplication, and gaps in roles and responsibilities as early as the project initiation stage. The model achieves its objective by incorporating consensus and quality of construction project teams in aggregating their opinions to decide on the party responsible for every standard task of a construction project. The roles and responsibilities of the owner and contractors are described to different extents using seven linguistic terms defined by triangular membership functions and constructed using a three-step Delphi approach, which allows experts to develop common understanding of the meaning of the terms by determining their overlap on a fuzzy linguistic scale. A modified similarity aggregation method (SAM) aggregates experts’ opinions in a linguistic framework using a consensus weight factor for each expert that is based on the similarity of his or her opinion relative to the other experts to ensure that the experts’ final decision is a result of common agreement. A fuzzy expert system (FES) determines an importance weight factor, representing expert quality for each expert; opinions are aggregated using this factor and the consensus weight factor. The FSC model contributes to the construction industry by solving a fundamental problem for project owners who want to identify and reduce potential conflicts between their project teams on the extent of their roles and responsibilities prior to the construction stage. Also, the FSC model provides an improvement over previous consensus-based approaches, which rely on a subjective assessment of experts’ important weights in aggregating their opinions, and it modifies the SAM to adapt it to a linguistic environment.
    publisherAmerican Society of Civil Engineers
    titleFuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities
    typeJournal Paper
    journal volume137
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000310
    treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian