YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Integrating Efficient Resource Optimization and Linear Schedule Analysis with Singularity Functions

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 001
    Author:
    Gunnar Lucko
    DOI: 10.1061/(ASCE)CO.1943-7862.0000244
    Publisher: American Society of Civil Engineers
    Abstract: Resources perform or enable physical operations and thus are vital on construction projects, yet are subject to various constraints. Their use within a project schedule must therefore be carefully planned. A major objective is optimizing when they are active within the float of noncritical activities to avoid disruptive and costly fluctuations. This paper builds on analyzing criticality of linear schedules with the unique singularity functions. The new approach keeps resources intact and derives one flexible equation for the complete resource profile of a schedule, including any timing or resource rate changes. Another equation models its first moment of area to minimize the objective function toward a level profile. A genetic algorithm is suitable for an iterative optimization. The parameters of its chromosomes are recombined evolutionarily and can model any permutation. Analyzing a road project illustrates how singularity functions integrate resource optimization with its linear schedule and facilitate a subsequent optimization.
    • Download: (334.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Integrating Efficient Resource Optimization and Linear Schedule Analysis with Singularity Functions

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58399
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorGunnar Lucko
    date accessioned2017-05-08T21:39:13Z
    date available2017-05-08T21:39:13Z
    date copyrightJanuary 2011
    date issued2011
    identifier other%28asce%29co%2E1943-7862%2E0000251.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58399
    description abstractResources perform or enable physical operations and thus are vital on construction projects, yet are subject to various constraints. Their use within a project schedule must therefore be carefully planned. A major objective is optimizing when they are active within the float of noncritical activities to avoid disruptive and costly fluctuations. This paper builds on analyzing criticality of linear schedules with the unique singularity functions. The new approach keeps resources intact and derives one flexible equation for the complete resource profile of a schedule, including any timing or resource rate changes. Another equation models its first moment of area to minimize the objective function toward a level profile. A genetic algorithm is suitable for an iterative optimization. The parameters of its chromosomes are recombined evolutionarily and can model any permutation. Analyzing a road project illustrates how singularity functions integrate resource optimization with its linear schedule and facilitate a subsequent optimization.
    publisherAmerican Society of Civil Engineers
    titleIntegrating Efficient Resource Optimization and Linear Schedule Analysis with Singularity Functions
    typeJournal Paper
    journal volume137
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000244
    treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian