YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 009
    Author:
    Zhen Yu Zhao
    ,
    Wei Yang You
    ,
    Jian Zuo
    DOI: 10.1061/(ASCE)CO.1943-7862.0000209
    Publisher: American Society of Civil Engineers
    Abstract: This research proposes an innovative critical chain method (ICCM) for project planning and control under resource constraints and uncertainty. An improved genetic algorithm is developed to identify the critical chain and to obtain the optimal start time of each activity under the most optimistic duration of each activity and resource constraints. Furthermore, a feeding buffer is added in an insert point in order to deal with uncertainties. The benefits of applying this ICCM are demonstrated in an example project.
    • Download: (192.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58361
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorZhen Yu Zhao
    contributor authorWei Yang You
    contributor authorJian Zuo
    date accessioned2017-05-08T21:39:09Z
    date available2017-05-08T21:39:09Z
    date copyrightSeptember 2010
    date issued2010
    identifier other%28asce%29co%2E1943-7862%2E0000216.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58361
    description abstractThis research proposes an innovative critical chain method (ICCM) for project planning and control under resource constraints and uncertainty. An improved genetic algorithm is developed to identify the critical chain and to obtain the optimal start time of each activity under the most optimistic duration of each activity and resource constraints. Furthermore, a feeding buffer is added in an insert point in order to deal with uncertainties. The benefits of applying this ICCM are demonstrated in an example project.
    publisherAmerican Society of Civil Engineers
    titleApplication of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty
    typeJournal Paper
    journal volume136
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000209
    treeJournal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian