YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Study of Real Options with Exogenous Competitive Entry to Analyze Dispute Resolution Ladder Investments in Architecture, Engineering, and Construction Projects

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 003
    Author:
    Carol Menassa
    ,
    Feniosky Peña Mora
    ,
    Neil Pearson
    DOI: 10.1061/(ASCE)CO.1943-7862.0000132
    Publisher: American Society of Civil Engineers
    Abstract: Architecture, engineering, and construction industry participants often find it pragmatic to implement a project-specific dispute resolution ladder (DRL) as a managerial tool to assist in the prompt resolution of claims and change orders (CCOs) that might arise during the project construction phase. This project-specific DRL consists of a single or multiple alternative dispute resolution (ADR) techniques that require capital expenditures to cover the expenses incurred by the owner’s/contractor’s employees and third-party neutrals. If a project-specific DRL is properly chosen, then the capital expenditures are outweighed by the expected benefits from the DRL implementation; namely, prompt resolution of the CCOs without incurring excessive cost overruns on an already financially stressed project budget, as well as avoiding the escalation of the claims to a dispute that requires long protracted litigation for final settlement. Typically, the decision as to which ADR techniques to include in the project-specific DRL is undertaken during the project planning phase prior to the actual occurrence of the CCOs. In this case, the project owner decide to invest in a DRL in exchange for the expected savings in the project. This decision regarding the project-specific DRL is usually done based on the experience of the project parties with the ADR techniques. However, such a decision needs to be guided by a financial tool that allows the project owner to evaluate alternative DRLs and choose the most economically feasible alternative based on the project and ADR characteristics. In this paper, a financial model is developed to evaluate DRL implementations in construction projects by drawing analogies from real option theory with exogenous competitive entry. More specifically, the occurrence of a given CCO will result in a reduction in the value of expected savings in the project due to DRL implementation. This is similar to the reduction in the gross value of a capital investment project in a commercial property due to competitive entry by another similar commercial property developer in the market. At the same time, the CCO resolution due to an effective DRL implementation will allow project owner to recover part of the losses in the expected savings in the project due to the DRL implementation. The model presented in this paper takes into account the characteristics of the various ADR techniques included in the project-specific DRL, and the characteristics of the CCOs occurring during the construction phase of the project. A case study of a real construction project is used to illustrate the practical implementation of the model. The results indicate that for this case project and from a financial point of view, the investment in the chosen project-specific DRL was not worthwhile because of the high uncertainty in the project, and the low effectiveness of the selected DRL. These conditions did not provide the owner with the anticipated advantage of the DRL implementation in reducing the value of the CCOs occurring in the project. At the same time the cost of the DRL implementation exceeded the actual savings attained in the project.
    • Download: (115.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Study of Real Options with Exogenous Competitive Entry to Analyze Dispute Resolution Ladder Investments in Architecture, Engineering, and Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58281
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorCarol Menassa
    contributor authorFeniosky Peña Mora
    contributor authorNeil Pearson
    date accessioned2017-05-08T21:39:02Z
    date available2017-05-08T21:39:02Z
    date copyrightMarch 2010
    date issued2010
    identifier other%28asce%29co%2E1943-7862%2E0000137.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58281
    description abstractArchitecture, engineering, and construction industry participants often find it pragmatic to implement a project-specific dispute resolution ladder (DRL) as a managerial tool to assist in the prompt resolution of claims and change orders (CCOs) that might arise during the project construction phase. This project-specific DRL consists of a single or multiple alternative dispute resolution (ADR) techniques that require capital expenditures to cover the expenses incurred by the owner’s/contractor’s employees and third-party neutrals. If a project-specific DRL is properly chosen, then the capital expenditures are outweighed by the expected benefits from the DRL implementation; namely, prompt resolution of the CCOs without incurring excessive cost overruns on an already financially stressed project budget, as well as avoiding the escalation of the claims to a dispute that requires long protracted litigation for final settlement. Typically, the decision as to which ADR techniques to include in the project-specific DRL is undertaken during the project planning phase prior to the actual occurrence of the CCOs. In this case, the project owner decide to invest in a DRL in exchange for the expected savings in the project. This decision regarding the project-specific DRL is usually done based on the experience of the project parties with the ADR techniques. However, such a decision needs to be guided by a financial tool that allows the project owner to evaluate alternative DRLs and choose the most economically feasible alternative based on the project and ADR characteristics. In this paper, a financial model is developed to evaluate DRL implementations in construction projects by drawing analogies from real option theory with exogenous competitive entry. More specifically, the occurrence of a given CCO will result in a reduction in the value of expected savings in the project due to DRL implementation. This is similar to the reduction in the gross value of a capital investment project in a commercial property due to competitive entry by another similar commercial property developer in the market. At the same time, the CCO resolution due to an effective DRL implementation will allow project owner to recover part of the losses in the expected savings in the project due to the DRL implementation. The model presented in this paper takes into account the characteristics of the various ADR techniques included in the project-specific DRL, and the characteristics of the CCOs occurring during the construction phase of the project. A case study of a real construction project is used to illustrate the practical implementation of the model. The results indicate that for this case project and from a financial point of view, the investment in the chosen project-specific DRL was not worthwhile because of the high uncertainty in the project, and the low effectiveness of the selected DRL. These conditions did not provide the owner with the anticipated advantage of the DRL implementation in reducing the value of the CCOs occurring in the project. At the same time the cost of the DRL implementation exceeded the actual savings attained in the project.
    publisherAmerican Society of Civil Engineers
    titleStudy of Real Options with Exogenous Competitive Entry to Analyze Dispute Resolution Ladder Investments in Architecture, Engineering, and Construction Projects
    typeJournal Paper
    journal volume136
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000132
    treeJournal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian