YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Improved Baseline Productivity Analysis Technique

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 003
    Author:
    Chien-Liang Lin
    ,
    Hong-Ming Huang
    DOI: 10.1061/(ASCE)CO.1943-7862.0000129
    Publisher: American Society of Civil Engineers
    Abstract: Previous studies have aimed to develop effective methods to derive baseline productivity (BP) for labor-intensive activities in construction sites. However, there are two different definitions of BPs: one is defined as a performance benchmark of best practice and the other as a standard reflecting a contractor’s normal operating performance. It is necessary to clarify the difference between the two definitions and their corresponding BPs. This research introduces data envelopment analysis (DEA) as a new method for deriving BP and compares DEA with the other four BP deriving methods. DEA is concluded as the best method in terms of objectivity, effectiveness, and consistency to find BP that represents the best performance a contractor can possibly achieve. With the capability of deriving productivities of multi-input and multi-output activities, the proposed DEA has raised the scale of labor productivity from the level of single factor productivity to total factor productivity which will help construction researchers and managers to evaluate performances of interests in a much more effective way.
    • Download: (149.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Improved Baseline Productivity Analysis Technique

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58278
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorChien-Liang Lin
    contributor authorHong-Ming Huang
    date accessioned2017-05-08T21:39:02Z
    date available2017-05-08T21:39:02Z
    date copyrightMarch 2010
    date issued2010
    identifier other%28asce%29co%2E1943-7862%2E0000134.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58278
    description abstractPrevious studies have aimed to develop effective methods to derive baseline productivity (BP) for labor-intensive activities in construction sites. However, there are two different definitions of BPs: one is defined as a performance benchmark of best practice and the other as a standard reflecting a contractor’s normal operating performance. It is necessary to clarify the difference between the two definitions and their corresponding BPs. This research introduces data envelopment analysis (DEA) as a new method for deriving BP and compares DEA with the other four BP deriving methods. DEA is concluded as the best method in terms of objectivity, effectiveness, and consistency to find BP that represents the best performance a contractor can possibly achieve. With the capability of deriving productivities of multi-input and multi-output activities, the proposed DEA has raised the scale of labor productivity from the level of single factor productivity to total factor productivity which will help construction researchers and managers to evaluate performances of interests in a much more effective way.
    publisherAmerican Society of Civil Engineers
    titleImproved Baseline Productivity Analysis Technique
    typeJournal Paper
    journal volume136
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000129
    treeJournal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian